Re: My Build 42" oven GT
I finished the 8th chain this evening, I noticed the water from the hose feels warmer than the water sitting in the bucket, winter is coming. I hope to get the dome and chimney done before its too cold. I used sticks on this chain then after placing a keystone in the chain, removed sections of the sticks to wash the inside. I replaced them until the mortar sets. Its a little more work but I like the clean joints on the inside, I am going to do as many more chains as I can this way.
[IMG][/IMG]
I finished the 8th chain this evening, I noticed the water from the hose feels warmer than the water sitting in the bucket, winter is coming. I hope to get the dome and chimney done before its too cold. I used sticks on this chain then after placing a keystone in the chain, removed sections of the sticks to wash the inside. I replaced them until the mortar sets. Its a little more work but I like the clean joints on the inside, I am going to do as many more chains as I can this way.
[IMG][/IMG]
Comment