My dome is done and i have almost completed the side and back enclosure walls. I am trying to figure out my roof. The outer layer of the roof is going to be copper mettalic colored standing seam metal roofing, so it matches the weber grill on the deck. it should look really nice!
I am planning on framing the roof with metal studs. The dome enclosure will be filled with loose vermiculite for insulation. Over the top of the dome i will have at least 8 inches of the vermiculite, maybe more, not sure yet.
My question is, can i use plywood sheathing over the metal studs as a substrate for the metal roof or should i use a concrete type backer board? With the insulation, will the roof get hot? Or hot enoughh to burn?
I plan on venting the eaves and peak of the roof. I am also putting in a cast iron cleanout door at the peak of the rear wall so i can look inside the enclosure and add more vermiculite later if it settles.
I am planning on framing the roof with metal studs. The dome enclosure will be filled with loose vermiculite for insulation. Over the top of the dome i will have at least 8 inches of the vermiculite, maybe more, not sure yet.
My question is, can i use plywood sheathing over the metal studs as a substrate for the metal roof or should i use a concrete type backer board? With the insulation, will the roof get hot? Or hot enoughh to burn?
I plan on venting the eaves and peak of the roof. I am also putting in a cast iron cleanout door at the peak of the rear wall so i can look inside the enclosure and add more vermiculite later if it settles.
Comment