Getting ready to start building oven floor and dome - could use some advice from experienced hands. In reading the instructions it look like option is to build floor inside dome walls or under dome walls. As described, building inside the dome allows for replacing damaged bricks but requires more cutting. Most of the pictures look like the floor is built and then the walls are built.
Just looked at photos from an oven building workshop and it looks like they started the walls with a couple of courses then built the floor inside the existing walls. That procedure seems like it would make it easier to fit the floor inside the walls and make everything work together better.
Am I missing something? Is there a reason for building the floor first and them starting to build the walls?
Just looked at photos from an oven building workshop and it looks like they started the walls with a couple of courses then built the floor inside the existing walls. That procedure seems like it would make it easier to fit the floor inside the walls and make everything work together better.
Am I missing something? Is there a reason for building the floor first and them starting to build the walls?
Comment