So got oven built last week, wont bore people with base construction as we all know a slab of concrete is not most exciting part.
Ok so i ordered 180 bricks for a 90cm or 36inch oven.
only used about 120 in total.
about 40 for floor (cut to fin inside walls)
and 80 for down ( i know i should have tapered bricks that way be better joints and would used more bricks)
all bonded with the home brew 4:1:1:1 mix
It started hammer down rain near end so foolishly rushed the last 3 chains and they look god dam awful
took time do part over the arch but looks awful. its insdide and wont be seen anyway more i know its there
left dry for 4 days under a tarp.
then had candles in it for 48 hours solid.
yesterday started curing with small fires but timber i think must have been damp as got lot smoke and soot inside.
Also fire got fairly hot 2 hours into it when i went for a walk and when came back there were lot cracks, 1 of which is leaking at the join between 2 cracks.
there then came few more that look be following brick joints.
also one over arch so not very please as fire must got very hot.
kept it going for 5 hours then left embers in it over night with door half blocked up to keep heat in and the cats out.
Ok so i ordered 180 bricks for a 90cm or 36inch oven.
only used about 120 in total.
about 40 for floor (cut to fin inside walls)
and 80 for down ( i know i should have tapered bricks that way be better joints and would used more bricks)
all bonded with the home brew 4:1:1:1 mix
It started hammer down rain near end so foolishly rushed the last 3 chains and they look god dam awful
took time do part over the arch but looks awful. its insdide and wont be seen anyway more i know its there
left dry for 4 days under a tarp.
then had candles in it for 48 hours solid.
yesterday started curing with small fires but timber i think must have been damp as got lot smoke and soot inside.
Also fire got fairly hot 2 hours into it when i went for a walk and when came back there were lot cracks, 1 of which is leaking at the join between 2 cracks.
there then came few more that look be following brick joints.
also one over arch so not very please as fire must got very hot.
kept it going for 5 hours then left embers in it over night with door half blocked up to keep heat in and the cats out.
Comment