Re: My first attempt for 42" oven / changed to 36"
Up to you George. You can use square half bricks. Most builders cut the wedge to reduce the sideways gap between each brick on the outside as well as eliminate the triangular gap that forms when you put two tipped bricks with square sides next to each other. So in actuality you are cutting a wedge but with the cut angled so you end up with a trapezoid if you look at the inside face of the brick. So if you do use square bricks just be aware you will have more gap to fill on the outside and have triangular gaps to fill on the inside.
I think most builders are trying to minimize as much as possible the mortar gaps inside as the brick is more durable, plus it looks nice. With a wet saw and jig it doesn't take much effort to do the cuts, but if I had to build with just an angle grinder I would think twice about having to make all those angle cuts for sure. Either way it should function perfectly fine.
Announcement
Collapse
No announcement yet.
My first attempt for 42" oven / changed to 36"
Collapse
X
-
Re: My first attempt for 42" oven / changed to 36"
Hi again,
Until the perlcrete layer will dry i prepare for the next steps.
First of all,do i need to cut all the bricks in half?
Do i need i cut also wedges?
Or half bricks are ok?
You can see my attachment.
My tool is an angle grinder,so i need the most easy method.Last edited by George_M; 12-14-2014, 10:31 AM.
Leave a comment:
-
Re: My first attempt for 42" oven / changed to 36"
Hi,
The weather is sunny today and the temperature is almost 17 oC or 62.6 F.
This is good for the perlcrete to dry earlier..
Leave a comment:
-
Re: My first attempt for 42" oven / changed to 36"
No problem Laurentius!
Not yet,i will search for pigment when i finish the dome.
Leave a comment:
-
Re: My first attempt for 42" oven / changed to 36"
Originally posted by George_M View PostHahahaha!!!
Now i need to protect the perlcrete from the rain if it start again.
So,i am prepared.I bought Tarpaulin to cover it when it starts to rain.
How many days need to dry before start the cooking floor?
Leave a comment:
-
Re: My first attempt for 42" oven / changed to 36"
Hahahaha!!!
Now i need to protect the perlcrete from the rain if it start again.
So,i am prepared.I bought Tarpaulin to cover it when it starts to rain.
How many days need to dry before start the cooking floor?
Leave a comment:
-
Re: My first attempt for 42" oven / changed to 36"
Originally posted by George_M View PostJust finished the perlcrete layer.
I used total 10parts perlite and 2 parts cement.
I didn't use to much water,i used 2,5 parts.
Needed more water
I hope that it sticks well.
Also,this material can hold the weight of the oven?
I think that will smash it
You can se my photos
I`m sorry to inform you that your name has been changed! You are hereby and forthwith will be known as, "Sir Doubting Thomas of Greece"! Yes, your perlcrete insulation layer will accommodated the weight of the oven. Yes, it will smash if your drop the oven onto it from almost any given height, but not if you build it brick by brick. Sand will do, the hearth need not to be cemented down, the sand is used to level the bricks, but its not necessary, the hearth bricks do not need spacing for expansion. When old ideas surface that have been proven false, (such as glass bottles, and mud, are great insulation for WFO`s), or new ideas that haven`t been tested, does bring out the ????? and perused with caution.
Leave a comment:
-
Re: My first attempt for 42" oven / changed to 36"
Looks good, George. It will work fine.
Leave a comment:
-
Re: My first attempt for 42" oven / changed to 36"
Just finished the perlcrete layer.
I used total 10parts perlite and 2 parts cement.
I didn't use to much water,i used 2,5 parts.
Needed more water
I hope that it sticks well.
Also,this material can hold the weight of the oven?
I think that will smash it
You can se my photosLast edited by George_M; 12-13-2014, 07:55 AM.
Leave a comment:
-
Re: My first attempt for 42" oven / changed to 36"
Hi,
Some modifications at the insulation layer.
I changed the height from 8" to 4" and i get totall 3 bags of pelite.
100L per bag and the cost is 9euro per bag.
Now i will start to prepare the perlcrete.
Leave a comment:
-
Re: My first attempt for 42" oven / changed to 36"
Originally posted by George_M View PostThanks Tony!
I prepared the wood frame and is ready for the perlcrete.
A bag of 100L perlite is enough or i need to buy more?
Leave a comment:
-
Re: My first attempt for 42" oven / changed to 36"
Originally posted by Tonyp View PostOh gosh, I don't know. I have only used ceramic board and blanket so have no experience in mixing the perlcrete. What's the volume of the perlcrete layer? I think if you are careful with mixing you won't lose too much volume by breaking up the perlite.
Leave a comment:
-
Re: My first attempt for 42" oven / changed to 36"
Originally posted by George_M View PostThanks Tony!
I prepared the wood frame and is ready for the perlcrete.
A bag of 100L perlite is enough or i need to buy more?
Oh gosh, I don't know. I have only used ceramic board and blanket so have no experience in mixing the perlcrete. What's the volume of the perlcrete layer? I think if you are careful with mixing you won't lose too much volume by breaking up the perlite.
Leave a comment:
-
Re: My first attempt for 42" oven / changed to 36"
Thanks Tony!
I prepared the wood frame and is ready for the perlcrete.
A bag of 100L perlite is enough or i need to buy more?
Leave a comment:
-
Re: My first attempt for 42" oven / changed to 36"
I wouldn't bother with the cement. I just used plain sand
Leave a comment:
Leave a comment: