    Re: Pompeii started in San Jose

    Originally posted by SteveB48 View Post
    Thanks David. We bought a whole pallet from Lowes. I don't know if that means it all came from the same batch. I have a small pour (a couple bags) I hope to do in the next couple of days and we'll see if that has the same problem. If I have no issues there, I have another one which is about 19 bags that I'll try before I get back to the oven slab. I do have a mixer. All the other concrete work in the yard was done with a pumper truck but that was more like 4 yards. I thought (still think) I can handle this.

    Darin,
    I thought about getting one of those concrete trailers but a friend told me that he had trouble with the rock settling out of the mix on the ride home. The equipment near me doesn't have the mixing trailers.

    Steve
    Yes when I did mine, we rented the mixer trailer. It was perfect.
    I can't imagine you having trouble twice.

    you will get it.

    Leave a comment:


  • RandyJ
    replied
    Re: Pompeii started in San Jose

    I saw this happen when we did a street light base. A lot of the stone fell to the bottom and all the cream was on top. Not a great plan for strength. When I mixed my slab I did about .625 gal per 60# bag and to make measuring quick and easy I pored the amount of water I wanted per batch in to a 5 gal bucket and made a mark so all I had to do was fill to the line and dump in worked great. I think it took 2 of us 2 hours to do 72 bags. I hope your next poor goes better.

    Randy

    Leave a comment:


  • NCMan
    replied
    Re: Pompeii started in San Jose

    Originally posted by DavidApp View Post
    Hello

    I thought that vibrating helped to get the air out and consolidated the mix.

    Always ready to learn something new.

    David
    The mix gets consolidated during the mixing phase. Excessive vibrating actually "un-consolidates" the mix. And air in the slab is a good thing. To help avoid "honeycombing" around the edges, a simple tap or two w/a hammer (on the outside of your formwork) should do the trick.
    Last edited by NCMan; 07-03-2015, 11:46 AM.

    Leave a comment:


  • DavidApp
    replied
    Re: Pompeii started in San Jose

    Hello NCMan

    Thank you.

    Knew about keeping the moisture in for as long as possible not allowing it to dry too quickly but did not realize that vibrating could cause separation. Makes sense when put like that.

    David

    Leave a comment:


  • NCMan
    replied
    Re: Pompeii started in San Jose

    Vibrating a slab around the edges can simply be done by tapping it as you go w/a hammer. Excessive vibrating causes all the ingredients to separate. There just is no need to vibrate a slab like that. Mix your concrete thoroughly, at a consistent slump (just enough water to make it workable) and place it, being sure to have your reinforcement raised up off the bottom, roughly in the middle of the slab. If it's hot out, try to keep the moisture in the slab as long as you can. I do that by covering the slab w/plastic and then cardboard. The plastic keeps the moisture in, while the cardboard keeps it in the shade for awhile. The last thing you want when pouring in hot weather is your slab drying out too fast. The longer you keep moisture in a slab, the stronger it will be. Also, spraying the slab w/water afterwards is not really recommended. It's far better to cover the slab and leave it covered for as long as you can. Excessive spraying of a slab can be detrimental in some cases and really does not help much, unless you could keep it wet continuously, which is tough to do. The best thing to do, when you are done, is to cover it the way I described, concentrating on keeping the existing moisture in the slab. Best of luck to you.
    Last edited by NCMan; 07-03-2015, 08:48 AM.

    Leave a comment:


  • DavidApp
    replied
    Re: Pompeii started in San Jose

    Hello

    I thought that vibrating helped to get the air out and consolidated the mix.

    Always ready to learn something new.

    David

    Leave a comment:


  • SteveB48
    replied
    Re: Pompeii started in San Jose

    Originally posted by NCMan View Post
    Vibrating a thin slab like that can do more harm than good and is not needed.
    Can you elaborate on this? I had expected that around the edges that vibrating would help.

    thanks
    Steve

    Leave a comment:


  • NCMan
    replied
    Re: Pompeii started in San Jose

    Vibrating a thin slab like that can do more harm than good and is not needed.

    Leave a comment:


  • DavidApp
    replied
    Re: Pompeii started in San Jose

    Hello Steve

    Lowes should have enough sales that age would not be the problem.

    I did not measure the water that carefully. I did use a gallon bucket but often added a bit more water if the mix looked too dry. When I floated the slab I did bring some water to the surface . Maybe an indication of a wet mix. I was working in the colder months so drying out was not an issue.

    Vibrating it may help.

    David

    Leave a comment:


  • SteveB48
    replied
    Re: Pompeii started in San Jose

    Thanks David. We bought a whole pallet from Lowes. I don't know if that means it all came from the same batch. I have a small pour (a couple bags) I hope to do in the next couple of days and we'll see if that has the same problem. If I have no issues there, I have another one which is about 19 bags that I'll try before I get back to the oven slab. I do have a mixer. All the other concrete work in the yard was done with a pumper truck but that was more like 4 yards. I thought (still think) I can handle this.

    Darin,
    I thought about getting one of those concrete trailers but a friend told me that he had trouble with the rock settling out of the mix on the ride home. The equipment near me doesn't have the mixing trailers.

    Steve

    Leave a comment:


  • Novaslo
    replied
    Re: Pompeii started in San Jose

    Any chance you can get a U-cart? Might be worth not messing with mixing your own and just go that route. I know it is more expensive, depending on what you pour. That is what I did and also used what I think they called a 6 sack mix. Or stronger more dense concrete.

    Good luck.

    Leave a comment:


  • DavidApp
    replied
    Re: Pompeii started in San Jose

    Hello Steve

    Sorry to hear about your pour.

    A thought before you do the second one. Do you have any idea how old the Quikcrete is?
    I know that Portland cement has a shelf life and will not set up if it is too old.

    Good luck with the next pour. Rent or borrow a mixer if you do not have one it will make it easier to get a good mix.

    David

    Leave a comment:


  • SteveB48
    replied
    Re: Pompeii started in San Jose

    Hi Chip,

    I don't have a picture that I can send you but in one corner you could scratch it with your finger and rather then just marking the surface, you could brush away cement and rock. It was acting more like it had just came out of the bag than a 1 day old pour. Saying that makes me wonder if it wasn't mixed thoroughly either. I never saw dry spots in the pour but...

    Steve

    Leave a comment:


  • mrchipster
    replied
    Re: Pompeii started in San Jose

    Sorry to hear that it did not work out. But I am still concerned about your tear out. Concrete is very weak for at least 2 - 3 days. But if you could not float it that could be a problem.

    Leave a comment:


  • SteveB48
    replied
    Re: Pompeii started in San Jose

    Well the slab is poured. Now I can tear it out The concrete is brittle and crumbles. I knew I was in trouble when I couldn't float it. Quikcrete calls for 4 pints of water / 60lbs bag so 1 gal for 2 bags. That just looked too dry so I gave it a bit more after mixing for awhile. I was remembering all the comments about most people adding too much water so I was being conservative. It was pretty warm and the sun was on the work site. Reading the the specs on the Quikcrete web site it says final water content between 4-7 pints / 60lbs bag. I was nowhere near 7. Maybe 4.5?

    Rather than take a chance and build an oven on top of a substandard slab, I'm going to start over. I have a couple of smaller pours to make so I'll do those first. I'm also going to invest in a concrete vibrator. I've a number of pours to do so I think that's a worthwhile investment.

    Thanks to Chip and Steve for their advice.

    Steve