If this is your first visit, be sure to
check out the FAQ by clicking the
link above. You may have to register
before you can post: click the register link above to proceed. To start viewing messages,
select the forum that you want to visit from the selection below.
Vent chimney and insulation complete. I used 3 inches if isowool and 4 inched of perlcrete. All went very fast. vent, chimney and insulation in less than 4 hours. Even had time to take the kids to the punkin patch.
Looks great! Thanks for posting the pics... cos I'm currently wondering how to do the transition between oven and chimney. Seems to be a wonderfully simple solution you chose.
And fast insulation is good news, too :-)
Frances
"Building a Brick oven is the most fun anyone can have by themselves." (Terry Pratchett... slightly amended)
I used 8 x 13 flue liner. I paid $11.00 per foot. I'm not a mason and I tried to do a fancier arch but that didn't turn out well. So I figured I would use the K.I.S.S. method (Keep It Simple, Stupid). I'm hoping it will draw like a freight train.
Comment