    Worked all day out there today and got half way done with the forth course. Lots of cuts but everything going smooth. I start each course by cutting every brick and numbering them - seems to take about an hour. Then I set them and cut the next row.
    Seems bigger in there to me now!?

    dusty

    Used the cut-off wedges this time between the second and third course.

    Leave a comment:


  • Les
    replied
    Re: dusty dome is 4" tall

    Ahh... I get your point. It's all uphill from there.

    Les...

    Leave a comment:


  • dusty
    replied
    Re: dusty dome is 4" tall

    dusty dome 4" tall -- so far! Just started. Mat be 6 1/2" tall by today and so on...

    dusty

    Leave a comment:


  • asudavew
    replied
    Re: dusty dome is 4" tall

    Originally posted by james View Post
    Another oven takes flight. Congratulations.

    Still, I have a question -- how do you cook pizza in a 4" high oven. :-)

    Dave, I have given into the dark side -- embrace your cracks.

    James

    Yes...
    I must embrace and fill! They do add character....

    Hopefully... the insulation this week..

    Leave a comment:


  • Les
    replied
    Re: dusty dome is 4" tall

    Dusty - I think you missed James' humor. Your thread is "dusty dome is 4 inches tall". I think you meant 4 feet tall. But if I am incorrect, I have to go with James, how do you cook a pizza in a 4 inch oven I think it may be ideal for a bread stick.

    Les...

    Leave a comment:


  • james
    replied
    Re: dusty dome is 4" tall

    LOL.

    Chicago Deep Dish?

    James

    Leave a comment:


  • dusty
    replied
    Re: dusty dome is 4" tall

    That was my idea Dave. I tried. But by the time I put even a tiny bit of motar on each side of it, the gap was to big between the big fat bricks. So then I tried to just tap them into the wet mortar after I set the bricks. It would only go part way, then start to move the brick I had just set. In the attatched pic you can see a stack of them on the piece of slate. I was going for it.

    James, since when do you make 5" tall pizzas?

    dusty

    Leave a comment:


  • james
    replied
    Re: dusty dome is 4" tall

    Another oven takes flight. Congratulations.

    Still, I have a question -- how do you cook pizza in a 4" high oven. :-)

    Dave, I have given into the dark side -- embrace your cracks.

    James

    Leave a comment:


  • asudavew
    replied
    Re: dusty dome is 4" tall

    Hey Dusty.

    I agree with Kemo and Ken.
    Good idea.

    But I was wondering about the piece you are cutting off....
    Could it be placed in the larger gap?
    Just a thought.

    My oven has some pretty good sized cracks... I used lots of mortar. So I thought this idea might help ya some. And save mortar for you.

    Keep up the good work, and the great picture posts.

    It's fun to watch.

    Leave a comment:


  • dusty
    replied
    Re: dusty dome is 4" tall

    Thanks Steve. And yea, I am thinking the less motar, the beter it may hold heat- but I'm not sure. What I DO know is that at $90 for 45lbs. delivered, I want to make this stuff go as far as possible!

    dusty

    Leave a comment:


  • Kemo
    replied
    Re: dusty dome is 4" tall

    Oh man...this is gonna be a great oven and a really good thread. Thanks for posting. I like your innovative ideas with the bricks. Logic tells me the less mortar you use the better the build... I cant wait to see how this all turns out.

    Leave a comment:


  • Ken524
    replied
    Re: dusty dome is 4" tall

    Outstanding work! Clever idea, cutting ever other brick. You're really off and running now.

    Leave a comment:


  • dusty
    started a topic dusty dome is 4" tall

    dusty dome is 4" tall

    Well... I'm off and running. Finally started building my oven. I ended up ordering refmix from our beloved FB on Monday. Took off of work a bit early that day, went home, and started laying out the soldier course. One thing led to another, and I ended up cutting a wedge off of every-other soldier brick. This so to cut in half the number of motar wedges I would have to make (and cut in half the amount of motar that I would use). My Refmix was on the porch the next day - yesterday! I started yesterday by glueing (with the sticky mortar) each wedge shaped soldier to the half brick soldier with a minimum of refmix - maybe 1/16". First photo.
    So, today, I had to set 22 big fat bricks instead of 44 skinny bricks. Twice as fast to level and set. These pics are at the half way point today. I ended up completeing the first course about 4:30. In the photos, you can see that I had a wedged shaped joint at every-other brick.
    I suppose I'm rambling, but the first four inches are done! Woo Hooo!