I am wondering how to finish the landing in front of the oven. I plan on building a house around the oven that will be flush with the front of the vent arch.
Should it be flush with the oven floor? If not how do I keep the front few bricks in place?
If it should be flush what is the usual build up to get form the slab up the 2" of insulation board plus the 2.25" of fire brick?
Can I build a form and lay some foam in to take up space and then pour a concrete landing?
Is it ok to pour concrete against the insulation board? Also if I were to do this the house would be the form for the back edge of the landing.
Any suggestions will be greatly appreciated.
Should it be flush with the oven floor? If not how do I keep the front few bricks in place?
If it should be flush what is the usual build up to get form the slab up the 2" of insulation board plus the 2.25" of fire brick?
Can I build a form and lay some foam in to take up space and then pour a concrete landing?
Is it ok to pour concrete against the insulation board? Also if I were to do this the house would be the form for the back edge of the landing.
Any suggestions will be greatly appreciated.
Comment