Hi,
More progress on my Pompeii:-
To be sure I narrowed the centres for rebar to about 10 inches, and poured a 4 inch structural slab.
I scored to perimeter of the slab, to bond the layer of concrete I will eventually pour as a border around insulation layer.
The vermicrete was interesting. I tried the slurry mix method and it went too lumpy, so I reverted to the standard dry mix method, but reduced the ratio to about 8:1. I made a drill mixer to get it started, then finished mixing by hand.
.......more to come
More progress on my Pompeii:-
To be sure I narrowed the centres for rebar to about 10 inches, and poured a 4 inch structural slab.
I scored to perimeter of the slab, to bond the layer of concrete I will eventually pour as a border around insulation layer.
The vermicrete was interesting. I tried the slurry mix method and it went too lumpy, so I reverted to the standard dry mix method, but reduced the ratio to about 8:1. I made a drill mixer to get it started, then finished mixing by hand.
.......more to come