Hi everyone & thanks for having me!
We recently started construction on our home built wood pizza oven. The base completed just yesterday. All square and level and now onto a 100mm hi strength concrete base.
My question is I see some people start the first course of brick stuck directly to the concrete slab. They then pour vermicrete or lay ceramic fibre sheet down, lay the fire brick floor and then proceed to laying the dome bricks. Is this right? How important is it to to pour the vermicrete or shape the ceramic fibre sheet down (cut to shape of course) and build the first course up from that?
I challenge starting the first course up from the ceramic fibre board or vermicrete because should it ever be compromised, the actual dome itself therefore too would be compromised.
Just after some some thoughts and best practices. Thanks so much guys, take care
Sam
We recently started construction on our home built wood pizza oven. The base completed just yesterday. All square and level and now onto a 100mm hi strength concrete base.
My question is I see some people start the first course of brick stuck directly to the concrete slab. They then pour vermicrete or lay ceramic fibre sheet down, lay the fire brick floor and then proceed to laying the dome bricks. Is this right? How important is it to to pour the vermicrete or shape the ceramic fibre sheet down (cut to shape of course) and build the first course up from that?
I challenge starting the first course up from the ceramic fibre board or vermicrete because should it ever be compromised, the actual dome itself therefore too would be compromised.
Just after some some thoughts and best practices. Thanks so much guys, take care
Sam
Comment