Originally posted by david s
View Post
I do think there is some benefit to having the vent at the highest point of the dome as well, I think it would be wise to incorporate your idea as well





…I don’t know that she can wait that long for my tarps to be thrown in the trash LOL…I think I can give it 2 and half weeks before the “big reveal” party. (Which we were hoping to have it painted for, but could possibly convince her we need to wait if it is better)… You think I am “trapping” a lot of moisture in the stucco if I do it that early? I am just doing a good exterior paint…not a “waterproofing paint”
I have been wanting to teach myself how to weld….could be an excuse to buy a welder.
…I also tend to “overbuild” things…I have weep holes and my cal si board is on busted up tiles, so it has a way out…it’s more through the stucco and perlite layers and like you mentioned the humidity. In my head I know it will be all right…I just…you know double check. Lol… thank you for the insight about just a low slow fire the day before a cook if the oven has seen a lot of rain, that’s what I was thinking and hoping.
Leave a comment: