With the insulation complete and curing I moved onto addressing the landing. I needed to extend the slab to fit my landing on and had some Oak beams so I cut them down and attached them to the front of the slab using concrete anchors and building adhesive
With my new found space I made another form and started dry fitting the entrance, I wanted my entrance to have a thermal break to allow for the movement of the dome so put a 10mm gap in the base, sides and arch. I used fire bricks on the internal face and the same bricks for the 3 arches for the outside with lose vermiculite packed into the space between.
With my new found space I made another form and started dry fitting the entrance, I wanted my entrance to have a thermal break to allow for the movement of the dome so put a 10mm gap in the base, sides and arch. I used fire bricks on the internal face and the same bricks for the 3 arches for the outside with lose vermiculite packed into the space between.
Comment