Update:
Completed the brickwork for the outer arch.
Also fixed up the inconsistent thickness of perlite.
I left a 20mm gap between the inner and outer arches for the door. There's going to be a landing slab placed on the bottom row of brick.
There's also a 25mm thermal break between the inner and outer arches, which I will fill with heat-resistant rope.

Put a wedge of brick to straighten the path of exhaust and support the vent

Completed the brickwork for the outer arch.
Also fixed up the inconsistent thickness of perlite.
I left a 20mm gap between the inner and outer arches for the door. There's going to be a landing slab placed on the bottom row of brick.
There's also a 25mm thermal break between the inner and outer arches, which I will fill with heat-resistant rope.
Put a wedge of brick to straighten the path of exhaust and support the vent





Comment