Hi all,
I'm hoping to pour here in the next few weeks, thanks all for participation on this forum, it's invaluable!
Here's a thought. I'm considering a truck pour in a few weeks. How outrageous would it be to have the foundation slab _and_ hearth base poured at the same time?
I'm planning to frame the hearth base, resting it on 4 x 4s on the ground nearby, where I'll screed, finish, level and cure......A couple (?) weeks later I'll use my front end loader to web sling it onto my block supports?
It'd be a gentle operation but I feel it could be done properly and safely with a few extra bodies....
I see a possible savings of several hours and it takes advantage of having the truck in place.....once....., as a newbie I should ask: ."...what am I missing here?"
I'm hoping to pour here in the next few weeks, thanks all for participation on this forum, it's invaluable!
Here's a thought. I'm considering a truck pour in a few weeks. How outrageous would it be to have the foundation slab _and_ hearth base poured at the same time?
I'm planning to frame the hearth base, resting it on 4 x 4s on the ground nearby, where I'll screed, finish, level and cure......A couple (?) weeks later I'll use my front end loader to web sling it onto my block supports?
It'd be a gentle operation but I feel it could be done properly and safely with a few extra bodies....
I see a possible savings of several hours and it takes advantage of having the truck in place.....once....., as a newbie I should ask: ."...what am I missing here?"
Comment