So, I have some pre-mixed refractory mortar. But the joints cant exceed 1/8th inch(3mm). my plan was to set the dome brick with this stuff then fill the back of the dome, where the gap is more like 1/2 inch, with type S and Fireclay mix in a grout bag.
Does anyone see a problem with that? I saw that Stonylake might have done this but it doesnt look like they are active on the site.