Announcement

Collapse
No announcement yet.

Concrete countertop cure times (how long to wait before placing the oven....)

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Concrete countertop cure times (how long to wait before placing the oven....)

    Quick question to those who have placed their ovens on concrete. I poured a 3.5" slab, connected to a thinner slab for BBQ and counter, and I am curious on how long folks waited before putting their oven on the slab. The 3.5" slab will take close to a month to fully cure, but of course you could walk on it now if I had poured it ground level. The Giardino 70 I am putting on it is about 500 lbs, and it will rest largely directly over the CMU base, so not a lot of load on the concrete that is not supported by the base. I would love to place the oven on top this weekend, 5-7 days after pouring, but I also do not want cracks.... any thoughts?

  • #2
    Answer (1 of 31): Life of any concrete structure primarily depends on the compressive strength of concrete and it is very important for any concrete construction project. Concrete strength also depends on the curing of concrete. Most of the common people does not know the minimum Curing Period o...


    Cement helps build safe and durable structures and is one of the best choices for environmentally friendly construction.


    give it at least 7 days.

    Comment


    • #3
      Thanks! Will do!

      Comment


      • #4
        Nice counter by the way! Mine is going to be almost identical. Working on the slab mold for the moment...

        Comment


        • #5
          Thanks! I feel like I need to do another one to get better at the process, but it is coming together well.

          Comment


          • #6
            How are you going finish the surface? Mine has been curing for 2 week now. Will remove the mold beginning of next week. I plan to grind a mm or two and then wet-polish. Then concrete sealer followed by an oil.

            Comment

            Working...
            X