    Just filled up the backs of the dome bricks tonight with a different mortar supplied with kit called "fondu mortar". Still high temp rated but supposed to be better for larger gaps. Mixed with washed brickies sand 1 part dry mortar to 3 parts sand, just enough water to make mortar like consistency when mixed. Much easier to fill the gaps than laying the bricks, especially when outside will be covered later anyway...

    Comment

    • david s
      Il Pizzaiolo
      • Mar 2007
      • 9209

      #32
      The wet ready to go mortar in the bucket sounds like a sodium silicate based mortar. The “fondu mortar” sounds to me more like Ciment Fondu which is calcium aluminate cement, not a premixed mortar. It requires the addition of a fine aggregate to create a mortar and what you have described that you did by mixing the 3 parts washed sand to it. Because it reacts far faster than Portland cement there is no need for extended damp curing.
      Kindled with zeal and fired with passion.

      Comment

      • Newie newby
        Laborer
        • Apr 2019
        • 53

        #33
        I noticed an earlier pic of the footing, blockwork and slab sizing is not showing from earlier post, so additional copy attached FYI.

        Comment

        • Newie newby
          Laborer
          • Apr 2019
          • 53

          #34
          Few more progress pics of the build. Had a little mate helping for a while .....

          Comment

          • Newie newby
            Laborer
            • Apr 2019
            • 53

            #35
            Gravity started to work against me as courses got higher, ended up propping bricks to stop the droop. Premixed Airset mortar on inside, then mixed up fondu cement for outside as courses continued up.

            Comment

            • Newie newby
              Laborer
              • Apr 2019
              • 53

              #36
              More help from feline friend...

              Comment

              • Newie newby
                Laborer
                • Apr 2019
                • 53

                #37
                Now up to plug layer. Added some plastic to capture waste, then added bricks and template, finished course of bricks then added sand to form shape of top of dome.

                Comment

                • Newie newby
                  Laborer
                  • Apr 2019
                  • 53

                  #38
                  Up she goes, much easier with form under bricks

                  Comment

                  • Newie newby
                    Laborer
                    • Apr 2019
                    • 53

                    #39
                    Decided to not cast the keystone tonight, hopefully when I remove the form and get the sand out from inside the dome tomorow I can stick my hand in and clean up the excess mortar then pour it later. Good feeling to have the dome closer to finished. Now to clean inside, do the flue arch and chimney and get the dome insulated...

                    Comment

                    • Newie newby
                      Laborer
                      • Apr 2019
                      • 53

                      #40
                      Cleaned up inside oven and keystone poured.

                      Comment

                      • Newie newby
                        Laborer
                        • Apr 2019
                        • 53

                        #41
                        Mocked up flue arch and chimney housing fire bricks. There won't be gaps once mortared in.

                        Comment

                        • SableSprings
                          Moderator
                          • May 2009
                          • 1310

                          #42
                          Get some shims under that arch form support. Mortar not only adds "extra spacing between bricks but it will set down tight on that form piece and can make it difficult to remove. We have had builders struggle to remove the form and actually loosen/damage their newly laid arch. Oven is looking great, you've done an excellent job on this build!
                          Mike Stansbury - The Traveling Loafer
                          Roseburg, Oregon

                          FB Forum: The Dragonfly Den build thread
                          Available only if you're logged in = FB Photo Albums-Select media tab on profile
                          Blog: http://thetravelingloafer.blogspot.com/

                          Comment

                          • UtahBeehiver
                            Member Moderator
                            • May 2012
                            • 5260

                            #43
                            Plus one Mike's shim comment, at least a 1/2" worth of shims or you won't get the form out without damaging the arch.
                            Last edited by UtahBeehiver; 10-12-2024, 01:02 PM.
                            Russell
                            https://photos.google.com/album/AF1Q...L9lr_UnUgJbF3Z

                            Comment

                            • Newie newby
                              Laborer
                              • Apr 2019
                              • 53

                              #44
                              Will do and thanks for the feedback. Cheers, Brad

                              Comment

                              • Newie newby
                                Laborer
                                • Apr 2019
                                • 53

                                #45
                                Made some more progress on the entry/flu arch, also added some bricks forward of the oven for a landing.