    Once forms in place, pulled out the fire bricks ready to start mixing the perlite concrete insulating slab. We have had a lot of rain here in past few months, the fire brick floor tiles are bloody heavy when they have absorbed lots of water!

    Leave a comment:


  • Newie newby
    replied
    Kit comes with 50mm calsil board for under floor insulation and insulating fire bricks for 1st course, but decided to cast another 90mm thick slab with 5:1 ratio perlite/cement mix under entire oven floor to get a bit more insulation. Made formwork with 90mm treated pine on suspended slab, then marked up around floor and perimeter bricks and cut some 3mm flexible masonite type sheet and formed curve and screwed into place.

    Leave a comment:


  • Newie newby
    replied
    Mock up of floor fire brick tiles

    Leave a comment:


  • Newie newby
    replied
    Bought a precut masonry 1000mm pompeii kit from sydney fire bricks. Looking forward to getting it built.

    Leave a comment:


  • Newie newby
    replied
    Put down aluminium garden edging, gravel one side and soil and turf the other. got the turf laid just before christmas last year.

    Back yard is starting to take shape with new rear covered deck, terraced retaining walls and garden areas, pool and man cave/brewery/boat shed/garage almost finished. Now onto the wood fired oven build....


    Click image for larger version

Name:	IMG_2819 (Medium).JPG
Views:	323
Size:	265.1 KB
ID:	457866 Click image for larger version

Name:	IMG_2841 (Medium).JPG
Views:	314
Size:	343.9 KB
ID:	457867 Click image for larger version

Name:	IMG_2815 (Medium).JPG
Views:	314
Size:	264.2 KB
ID:	457868 Click image for larger version

Name:	IMG_3081 (Medium).JPG
Views:	308
Size:	297.2 KB
ID:	457869 Click image for larger version

Name:	IMG_2840 (Medium).JPG
Views:	309
Size:	342.0 KB
ID:	457870 Click image for larger version

Name:	IMG_2843 (Medium).JPG
Views:	311
Size:	406.0 KB
ID:	457871

    Leave a comment:


  • Newie newby
    replied
    So the slab was poured last September, then worked on some more landscaping and edging to get ready to lay turf to this terrace area.


    Click image for larger version

Name:	IMG_2589 (Medium).JPG
Views:	327
Size:	303.2 KB
ID:	457859 Click image for larger version

Name:	IMG_2591 (Medium).JPG
Views:	317
Size:	343.7 KB
ID:	457860 Click image for larger version

Name:	IMG_2599 (Medium).JPG
Views:	307
Size:	351.5 KB
ID:	457861 Click image for larger version

Name:	IMG_2590 (Medium).JPG
Views:	312
Size:	321.6 KB
ID:	457862 Click image for larger version

Name:	IMG_2594 (Medium).JPG
Views:	312
Size:	311.0 KB
ID:	457863 Click image for larger version

Name:	IMG_2808 (Medium).JPG
Views:	312
Size:	360.7 KB
ID:	457864

    Leave a comment:


  • Newie newby
    replied
    Click image for larger version

Name:	IMG_2401 (Medium).JPG
Views:	330
Size:	258.8 KB
ID:	457855 Click image for larger version

Name:	IMG_2398 (Medium).JPG
Views:	307
Size:	263.7 KB
ID:	457856 Click image for larger version

Name:	IMG_2402 (Medium).JPG
Views:	316
Size:	244.8 KB
ID:	457857

    Leave a comment:


  • Newie newby
    replied
    Click image for larger version

Name:	IMG_2379 (Medium).JPG
Views:	343
Size:	218.9 KB
ID:	457849 Click image for larger version

Name:	IMG_2381 (Medium).JPG
Views:	303
Size:	272.4 KB
ID:	457850 Click image for larger version

Name:	IMG_2382 (Medium).JPG
Views:	303
Size:	284.5 KB
ID:	457851 Click image for larger version

Name:	IMG_2380 (Medium).JPG
Views:	320
Size:	223.9 KB
ID:	457852 Click image for larger version

Name:	IMG_2392 (Medium).JPG
Views:	309
Size:	264.3 KB
ID:	457853

    Leave a comment:


  • Newie newby
    replied
    Didn't realise how long it would take to mix by hand and it was dark by the time I got it in. Could have gotten a better finish on it if I kept going back to it but was getting a bit late and I was over it by this time. Will probably be tiling the slab surface later anyway so all good. Put a bit of fall from back to outsides and also centre slightly higher to reduce water ponding under floor. Will just add some sand under floor to level up later. Beer always tastes nicer when you have done a bit of concreting! Click image for larger version

Name:	IMG_2368 (Medium).JPG
Views:	327
Size:	288.5 KB
ID:	457843 Click image for larger version

Name:	IMG_2370 (Medium).JPG
Views:	316
Size:	154.5 KB
ID:	457844 Click image for larger version

Name:	IMG_2366 (Medium).JPG
Views:	298
Size:	308.1 KB
ID:	457845 Click image for larger version

Name:	IMG_2369 (Medium).JPG
Views:	305
Size:	203.3 KB
ID:	457846 Click image for larger version

Name:	IMG_2364 (Medium).JPG
Views:	317
Size:	298.1 KB
ID:	457847

    Leave a comment:


  • Newie newby
    replied
    Click image for larger version

Name:	IMG_2357 (Medium).JPG
Views:	313
Size:	324.8 KB
ID:	457837 Click image for larger version

Name:	IMG_2360 (Medium).JPG
Views:	311
Size:	318.9 KB
ID:	457838 Click image for larger version

Name:	IMG_2361 (Medium).JPG
Views:	308
Size:	293.8 KB
ID:	457839 Click image for larger version

Name:	IMG_2362 (Medium).JPG
Views:	313
Size:	247.8 KB
ID:	457840 Click image for larger version

Name:	IMG_2358 (Medium).JPG
Views:	300
Size:	327.5 KB
ID:	457841

    Leave a comment:


  • Newie newby
    replied
    Few more construction pics Click image for larger version

Name:	IMG_2346 (Medium).JPG
Views:	317
Size:	289.2 KB
ID:	457831 Click image for larger version

Name:	IMG_2343 (Medium).JPG
Views:	327
Size:	223.7 KB
ID:	457832 Click image for larger version

Name:	IMG_2338 (Medium).JPG
Views:	304
Size:	293.3 KB
ID:	457833 Click image for larger version

Name:	IMG_2350 (Medium).JPG
Views:	303
Size:	287.8 KB
ID:	457834 Click image for larger version

Name:	IMG_2349 (Medium).JPG
Views:	302
Size:	327.6 KB
ID:	457835

    Leave a comment:


  • Newie newby
    replied
    With around 140-150mm deep RC slab (and 190mm plus thickened edge beam to perimeter of stand), top of slab will be just under 1000mm high.
    Added lots of dowel bars into existing walls, plus internal perimeter beam screw bolted into blocks.
    Sacrificial corrugated iron cladding to base of suspended slab, temporary timber supports under.
    Form ply to perimeter as formwork, screw bolted to blockwork.
    Went crazy with lots of bottom, top and edge beam steel, with steel and slab thickness I dont think it will fall down any time soon.
    Added plastic electrical conduit in centre of slab too as drain hole for any moisture under oven floor.


    Click image for larger version

Name:	IMG_2302 (Medium).JPG
Views:	349
Size:	260.7 KB
ID:	457824 Click image for larger version

Name:	IMG_2322 (Medium).JPG
Views:	308
Size:	283.2 KB
ID:	457825 Click image for larger version

Name:	IMG_2324 (Medium).JPG
Views:	309
Size:	306.0 KB
ID:	457826 Click image for larger version

Name:	IMG_2325 (Medium).JPG
Views:	319
Size:	212.9 KB
ID:	457827 Click image for larger version

Name:	IMG_2327 (Medium).JPG
Views:	302
Size:	276.8 KB
ID:	457828 Click image for larger version

Name:	IMG_2336 (Medium).JPG
Views:	310
Size:	260.2 KB
ID:	457829

    Leave a comment:


  • Newie newby
    replied
    Got our block layer back to lay the extra blocks. Added horizontal and vertical starter bars and core filled with home mixed concrete. Bought an old mixer to make things a bit easier for me on site. Click image for larger version

Name:	IMG_1660 (Medium).JPG
Views:	444
Size:	365.1 KB
ID:	457818 Click image for larger version

Name:	IMG_2261 (Medium).JPG
Views:	323
Size:	304.4 KB
ID:	457819 Click image for larger version

Name:	IMG_1661 (Medium).JPG
Views:	310
Size:	290.5 KB
ID:	457820 Click image for larger version

Name:	IMG_2252 (Medium).JPG
Views:	438
Size:	294.0 KB
ID:	457821 Click image for larger version

Name:	IMG_1669 (Medium).JPG
Views:	307
Size:	252.9 KB
ID:	457822

    Leave a comment:


  • Newie newby
    replied
    As the existing strip footings extend out a decent distance out from the retaining walls, I just dug out a couple of extra pads, added some reinforcing steel and starter bars for the blocks and concreted the footings to create a good base for the stand.

    If you are wondering what the stone blocks are, they were old house piers that were on site that we decided to keep and repurpose into some steps and seating to the new terrace area. They were too heavy for me to lift, I got a guy with a machine to help move these into place a bit later on.

    Click image for larger version

Name:	IMG_0899.JPG
Views:	545
Size:	320.6 KB
ID:	457815 Click image for larger version

Name:	IMG_0898.JPG
Views:	321
Size:	368.6 KB
ID:	457816





    Leave a comment:


  • Newie newby
    replied
    Here's a sketch of the additional blockwork and footings extended from the existing core filled RC retaining walls