    Well, it took a year or so, but I finally poured the countertops (they will dry to the same color as the wall). I will grind them down a bit, and move on to the pergola. I still need to caulk and paint the damned oven for that matter. Note to self: Next time do not make the oven usable until everything else is finished.

    Comment

    • ggoose
      Apprentice
      • Sep 2010
      • 202

      #197
      Re: It is begun

      Those countertops look great. I am guessing you poured them in place. With what will you grind them? I am considering a concrete top for my build, though I need to research the process a bit first.
      gene

      Comment

      • Derkp
        Apprentice
        • Apr 2010
        • 188

        #198
        Re: It is begun

        Tom,

        What goes in the cutout under the medalion?

        Derk

        Comment

        • GianniFocaccia
          Il Pizzaiolo
          • Jun 2009
          • 1645

          #199
          Re: It is begun

          Note to self: Next time do not make the oven usable until everything else is finished.
          Tom, I disagree Why go to all the trouble of a 4-hr dome build and not be able to use it right away? You could have easily thrown a couple of pork shoulders in your finished oven at 228F and in the ten hours it takes to create pulled pork have the counters and tops built, poured, polished and sealed.

          John

          Comment

          • Tscarborough
            Il Pizzaiolo
            • Oct 2009
            • 3341

            #200
            Re: It is begun

            Derk, that is where the sink goes. I cut 95% of the cement board in the cutout, so I just have to make a few cuts and it is open to the bottom.

            Comment

            • splatgirl
              Journeyman
              • Jun 2009
              • 473

              #201
              Re: It is begun

              Being the guru of all things concrete and masonry tscarborough, do you have any idea how much heat can be applied to part of a (thinish) concrete slab before it spalls or cracks? Your grill/countertop proximity is similar to one of my kitchen tops which is next to my 130,000btu commercial wok burner gets too hot to touch if I'm using the wok for any period of time. It's been fine over the six years it's been in use, but I figure some day it's going to object.

              Comment

              • Tscarborough
                Il Pizzaiolo
                • Oct 2009
                • 3341

                #202
                Re: It is begun

                500 sustained degrees will cause the portland cement matrix to disintegrate. Direct flame will cause spalling, sometimes explosively. I have burned the grill quite a few times and measured the heat in that area, and it remains below 400 degrees.

                Comment

                • GianniFocaccia
                  Il Pizzaiolo
                  • Jun 2009
                  • 1645

                  #203
                  Re: It is begun

                  Tom,

                  Now you got me scared. The joints facing the inside of my oven are approximately 3/16" and made with 3-1-1-1 homebrew mortar. With this recipe, the portland comprises 16% of the mix. Exposed to direct flame, how long will it take for this mortar to disintegrate and eventually fail?

                  John

                  Comment

                  • david s
                    Il Pizzaiolo
                    • Mar 2007
                    • 9215

                    #204
                    Re: It is begun

                    That's what the lime in the mix is for. If the Portland cement fails the lime takes over as it can handle the heat.
                    Kindled with zeal and fired with passion.

                    Comment

                    • Tscarborough
                      Il Pizzaiolo
                      • Oct 2009
                      • 3341

                      #205
                      Re: It is begun

                      Below 20% the portland acts as a "gauging" agent, not the primary cement. It is used for a rapid enough set to allow the work to proceed. Lime is an excellent cement, but it does not have an initial set. It hardens over time by the process of absorbing carbon dioxide from the air, and thus something has to be added to give the initial set.

                      If it was readily available, brick dust is a better choice as a gauging material, and when I have it, that is what I prefer to use for lime mortars/plasters.

                      Comment

                      • GianniFocaccia
                        Il Pizzaiolo
                        • Jun 2009
                        • 1645

                        #206
                        Re: It is begun

                        Thanks for the explanation, Tom. Makes me feel a lot better since I opted for an 'old world brick' look to the inside of the dome rather than the 'mortarless stacked brick' look.

                        Two questions then:

                        Given portland's initial-set benefits and lime's cementious qualities, can the 3-1-1-1 proportions be tweaked to reduce portand's refractory weakness?

                        What is the difference between brick dust and fire (mortar) clay?

                        I am continually amazed at the amount of knowledge you have and readily share.

                        Thanks a million,

                        John

                        Comment

                        • Tscarborough
                          Il Pizzaiolo
                          • Oct 2009
                          • 3341

                          #207
                          Re: It is begun

                          As a rule, 10% is considered the max for gauging material. For plaster or anything similar I would not use more. For a compression structure, the mortar acts mainly to hold the units apart and won't fall out unless mechanically disturbed, so 20 to 25% Portland cement by volume of the cementious materials is not a problem.

                          Comment

                          • Nic The Landscaper
                            Apprentice
                            • Jul 2010
                            • 100

                            #208
                            Re: It is begun

                            a far better thing to do than mess with the portland, lime, aggregate ratio is to add about .25 parts of a pozzolan to the mix. Pozzolans speed up the reaction process of the lime, extend the life of the portland cement and add initial hardness themselves. It is one of the many things I add to my concrete spec mixes for almost everything now.

                            Comment

                            • Tscarborough
                              Il Pizzaiolo
                              • Oct 2009
                              • 3341

                              #209
                              Re: It is begun

                              Pozzolans are a great gauging material if available.

                              Comment

                              • GianniFocaccia
                                Il Pizzaiolo
                                • Jun 2009
                                • 1645

                                #210
                                Re: It is begun

                                Wow. Pozzolans add initial hardness, speeds up lime action, extends the life of portland and keeps the wife satisfied. What else could a guy want?

                                More importantly, where can I get this miracle stuff?