Hi all,
I am new here again, as I was previously a member. I had planned on building my dream WFO about 4 yrs ago but then decided to sell my former house and build a new one. Well I did that, began building in Aug. of '08 and moved into new home in April of '09. Well since then I managed to sell the other house and get settled in the new house and finish the front landscaping and some other projects. Now it's finally time to do the back landscaping beginning with my WFO as the anchor point.
I've decided on a 42" Pompeii in a corner install. This oven will be part of a corner kitchen with counter tops to the left and right in a "L" shape. I plan on incorporating a sink and 30"-36" grill too. In the end I plan to have a pergola type structure encompassing the outdoor cooking area. The oven's exterior will be finished off in multi-color slate tile with some black slate tile accents and a black slate tile shelf / ledge.
I've read through the Forno Bravo Plans a couple of times and still have some confusion about some aspects of the build. However, I am both excited to get started and dreading it at the same time. I'm very creative and quite handy so I'm up to the task of doing the job / work, but I do think it will take longer than I estimate?..doesn't stuff like this always take longer than planned? I hope to get it done as quickly as possible because I am an absolute pizza fiend (a Pizza Connoisseur ) but since I will eat pretty much any red sauced pizza I think of myself as a Pizza Common Sewer LOL.
I tend to be pretty perfectionistic but have decided to make an effort to NOT OVER THINK this oven project. I'm going to worry about being safe, square and level and try my best to keep the interior of the oven looking clean and not worry about the look of the dome's exterior which will get insulated and hidden. I think I am going to shoot for a 17 to 18 inch interior height and if I get off in height maybe I won't exceed 19 inches.
So far I've extended PVC pipe for both water and electrical connections to the outdoor kitchen area and am close to being ready to begin the oven's slab foundation. I am currently trying to finalize the slab dimensions.
I've attached a sketch of the proposed oven and some initial images / diagrams of the back yard area where the oven will go, etc. I suspect this total backyard project will take a good bit of time to complete by the time I build the oven, pergola structure and cabinets, etc. Not to mention the paving / decking and fencing.
If any of you seasoned WFO builders have any suggestions or opinions of what I've got so far it would be appreciated greatly. I hope to pour a slab sometime this month for now I can begin digging.
Thanks in advance for your time and attention.
Bill
I am new here again, as I was previously a member. I had planned on building my dream WFO about 4 yrs ago but then decided to sell my former house and build a new one. Well I did that, began building in Aug. of '08 and moved into new home in April of '09. Well since then I managed to sell the other house and get settled in the new house and finish the front landscaping and some other projects. Now it's finally time to do the back landscaping beginning with my WFO as the anchor point.
I've decided on a 42" Pompeii in a corner install. This oven will be part of a corner kitchen with counter tops to the left and right in a "L" shape. I plan on incorporating a sink and 30"-36" grill too. In the end I plan to have a pergola type structure encompassing the outdoor cooking area. The oven's exterior will be finished off in multi-color slate tile with some black slate tile accents and a black slate tile shelf / ledge.
I've read through the Forno Bravo Plans a couple of times and still have some confusion about some aspects of the build. However, I am both excited to get started and dreading it at the same time. I'm very creative and quite handy so I'm up to the task of doing the job / work, but I do think it will take longer than I estimate?..doesn't stuff like this always take longer than planned? I hope to get it done as quickly as possible because I am an absolute pizza fiend (a Pizza Connoisseur ) but since I will eat pretty much any red sauced pizza I think of myself as a Pizza Common Sewer LOL.
I tend to be pretty perfectionistic but have decided to make an effort to NOT OVER THINK this oven project. I'm going to worry about being safe, square and level and try my best to keep the interior of the oven looking clean and not worry about the look of the dome's exterior which will get insulated and hidden. I think I am going to shoot for a 17 to 18 inch interior height and if I get off in height maybe I won't exceed 19 inches.
So far I've extended PVC pipe for both water and electrical connections to the outdoor kitchen area and am close to being ready to begin the oven's slab foundation. I am currently trying to finalize the slab dimensions.
I've attached a sketch of the proposed oven and some initial images / diagrams of the back yard area where the oven will go, etc. I suspect this total backyard project will take a good bit of time to complete by the time I build the oven, pergola structure and cabinets, etc. Not to mention the paving / decking and fencing.
If any of you seasoned WFO builders have any suggestions or opinions of what I've got so far it would be appreciated greatly. I hope to pour a slab sometime this month for now I can begin digging.
Thanks in advance for your time and attention.
Bill