Re: Under way in Socal
Ahhh...ok making a bit more sense now. The idea is to complete the dome with an inner arch and then construct a vent arch outside of that. I was getting a bit confused reading so many posts and so many ideas swirling around in my head. Many thanks to you Russell for the pic..it truly was worth a thousand or so words. I too find that GF's build is among the top 5 on this forum and his words of wisdom have already saved me probably weeks of undoing something!
How much of a heatbreak do you think would be necessary using the rope/caulk method? I looked online for ceramic rope and it looks like they even have a square braided variety. Looking at that I'm almost thing cutting the break down to 1/4", especially on the floor.
Also I am assuming that the door seals COMPLETELY inside the inner arch and the sole function of building the outer arches/vent landing is to support the chimney?
Ahhh...ok making a bit more sense now. The idea is to complete the dome with an inner arch and then construct a vent arch outside of that. I was getting a bit confused reading so many posts and so many ideas swirling around in my head. Many thanks to you Russell for the pic..it truly was worth a thousand or so words. I too find that GF's build is among the top 5 on this forum and his words of wisdom have already saved me probably weeks of undoing something!
How much of a heatbreak do you think would be necessary using the rope/caulk method? I looked online for ceramic rope and it looks like they even have a square braided variety. Looking at that I'm almost thing cutting the break down to 1/4", especially on the floor.
Also I am assuming that the door seals COMPLETELY inside the inner arch and the sole function of building the outer arches/vent landing is to support the chimney?
Comment