You spelt July wrong........
. Try again tomorrow.
need opinions.
.
. I considered a damper on the flue as well. I'm curios to hear from Gulf on the utility he has found with his............... I'm still considering, but in the interest of speeding my build I left it out of my chimney, I'm thinking of maybe incorporating it in my stainless steel chimney extension\spark arrestor. Although Over dampering on the chimney could cause smoke to come out the front of the vent area's outside door
............... I thinking some type of temperature\damper controller might work better work on the inside oven door.
.....I guess I'll never know.
........... Added some thermocouples to help with the curing process and to play with later. I have been trying to hold the dome top at 200degrees today.
.......... I used a respirator, I think next time I'll were a Tyvex suit. I was thinking of putting the insulation on the dome for curing then remove on inspect for cracks. I don't think I want to do that,...........
It's to nasty.............. Also I got all the studs cut for the chimney surround..............
.......... It's official, first fire.
.....although just a draw test on the flu, a wad of paper........... I think I will let her rest and cure while I work on insulating and the enclosure....................
.
Leave a comment: