I managed to get all the block laid today, except for the two right in front of the chimney. I left those out to give me better access to bring the chimney up higher than the wall. It's just easier that way. Tomorrow, I'll run the chimney up high enough to have it out of the future roof elevation. Then I plan to set my anchor bolts in the top of the wall to attach my treated sill plates to. I have my Roxul insulation to cover the dome and bags of loose Perlite to fill the rest of the cavity prior to closing it all up. Hopefully soon I can work on framing up the roof, etc. Here's a couple of photos to show some of the "fun" cuts on the block I had to make around the decorative arch. I'm glad they are over with.





Leave a comment: