Starting the entry arch
I lost a couple weeks due to being out of town for work but I’m back at it. I should finish up the last of the brick work this weekend. I got the chimney parts on order from Canada. Two 45’s, an 8″ and a 36″ section, base plate, bracket, and cap. Came to almost $1000 with shipping! Surprisingly that was cheaper than it would have been in the US due to our current exchange rate. Then it will be time to cure, insulate, and stucco. I can almost smell the pizza!
Couple questions:
Do most of you clean the inside with sulfuric (muriatic) acid to make things pretty?
Do I need to worry about curing the vent arch even though it wont be as hot because of the thermal break? If not, I can start curing now while I finish the arch. The dome has been sitting in the California heat for over a month already.
I lost a couple weeks due to being out of town for work but I’m back at it. I should finish up the last of the brick work this weekend. I got the chimney parts on order from Canada. Two 45’s, an 8″ and a 36″ section, base plate, bracket, and cap. Came to almost $1000 with shipping! Surprisingly that was cheaper than it would have been in the US due to our current exchange rate. Then it will be time to cure, insulate, and stucco. I can almost smell the pizza!
Couple questions:
Do most of you clean the inside with sulfuric (muriatic) acid to make things pretty?
Do I need to worry about curing the vent arch even though it wont be as hot because of the thermal break? If not, I can start curing now while I finish the arch. The dome has been sitting in the California heat for over a month already.