Here are the links to the different portions of our build:
In Getting Started section, I included the Design, Specs and Supplies & Equipment:
36" in DFW Area - picture of finished product - post #1 http://www.fornobravo.com/forum/f6/3...rea-21562.html (36" in DFW Area)and below.
36" in DFW Area - Design Phase - post #5 http://www.fornobravo.com/forum/f6/3...tml#post184271 (36" in DFW Area)
36" in DFW Area - Specs - post #14 http://www.fornobravo.com/forum/6/36...tml#post184280 (36" in DFW Area)
36" in DFW Area - Supplies & Equipment - post #15 http://www.fornobravo.com/forum/6/36...tml#post184281 (36" in DFW Area)
In the IT, Jigs, & Forms section, I included our IT, Jigs and Forms used:
36" in DFW Area - IT, jigs and forms - http://www.fornobravo.com/forum/f28/...tml#post184284 (36" in DFW Area - IT, jigs and forms)
In the Pompeii Oven Construction section - I included the building of our oven:
36" in DFW Area - Building the Oven - http://www.fornobravo.com/forum/f8/3...tml#post184381 (36" in DFW Area - Building the Oven!)
We had the base for the oven made by a contractor, then we built the oven, and they came back and did the oven enclosure and finishing work. The concrete on top of the oven base was covered with a leveling concrete to make it smoother and more level.
In Getting Started section, I included the Design, Specs and Supplies & Equipment:
36" in DFW Area - picture of finished product - post #1 http://www.fornobravo.com/forum/f6/3...rea-21562.html (36" in DFW Area)and below.
36" in DFW Area - Design Phase - post #5 http://www.fornobravo.com/forum/f6/3...tml#post184271 (36" in DFW Area)
36" in DFW Area - Specs - post #14 http://www.fornobravo.com/forum/6/36...tml#post184280 (36" in DFW Area)
36" in DFW Area - Supplies & Equipment - post #15 http://www.fornobravo.com/forum/6/36...tml#post184281 (36" in DFW Area)
In the IT, Jigs, & Forms section, I included our IT, Jigs and Forms used:
36" in DFW Area - IT, jigs and forms - http://www.fornobravo.com/forum/f28/...tml#post184284 (36" in DFW Area - IT, jigs and forms)
In the Pompeii Oven Construction section - I included the building of our oven:
36" in DFW Area - Building the Oven - http://www.fornobravo.com/forum/f8/3...tml#post184381 (36" in DFW Area - Building the Oven!)
We had the base for the oven made by a contractor, then we built the oven, and they came back and did the oven enclosure and finishing work. The concrete on top of the oven base was covered with a leveling concrete to make it smoother and more level.
Comment