Begining dome construction

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • rlf5
    replied
    Re: Begining dome construction

    I think i'm just going to go over the floor with a belt sander after everything is locked in. Most of the floor seems to be pretty dang smooth.

    Leave a comment:


  • Hendo
    replied
    Re: Begining dome construction

    Originally posted by dmun View Post
    The leveling layer is designed to level off the rough surface of a vermiculite concrete pour. You may not need to do this - I didn't, just left the bricks sit on the insulation board.
    I found that my bricks were not dimensionally identical, and I ended up with some minor height differences where the peel could catch. Hence the dry fireclay (which stayed dry) to pack between the low bricks and the insulation sheets. Those bricks that were OK were, like David's, placed directly on the insulation.

    I didn't find that numbering and removing all the bricks was a great hassle, and I think it would have been harder to remove only those bricks that needed adjustment. And when they went back, I knew they'd be staying there! Very satisfying.

    Paul.

    Leave a comment:


  • Les
    replied
    Re: Begining dome construction

    Ron,

    I had to use the sand/clay to fill in the small uneven spots I had. The board wanted to rock in a few spots. Someone had suggested that you leave it dry untill the leveling is complete - I would go that route if I had to do it over. It will give you more time, then again, I was cutting and placing at the same time (in 90+ degrees).

    Les...

    Leave a comment:


  • rlf5
    replied
    Re: Begining dome construction

    Sounds good to me. I guess that means I'm sticking with 2" of insulation board on the bottom instead of four. Oh well...leaves more money for the chimney and pizza tools.

    Leave a comment:


  • dmun
    replied
    Re: Begining dome construction

    Originally posted by rlf5 View Post
    Now I have the fun task of numbering them, taking them off, and putting down the layer of clay/sand/water for them to sit on.
    The leveling layer is designed to level off the rough surface of a vermiculite concrete pour. You may not need to do this - I didn't, just left the bricks sit on the insulation board.

    Leave a comment:


  • rlf5
    replied
    Re: Begining dome construction

    Finished the other half of the floor bricks. Now I have the fun task of numbering them, taking them off, and putting down the layer of clay/sand/water for them to sit on. The last picture is of one of 'hands' taking a break.

    Leave a comment:


  • Unofornaio
    replied
    Re: Begining dome construction

    Originally posted by rlf5 View Post
    Les

    Havn't had any problems yet, but I may just try your suggestion. Thanks!
    Its just a matter of time before you will...

    The quality of those pumps is pretty good actually. Its not really a saw pump its a fountain pump, doing the bucket thing will ensure it will last the life of the project.

    Another trick is to have a 5gal bucket under the drain hole and just leave it drain into the bucket. When cutting dozens of bricks in the same day especially fire brick the tray is very difficult to clean. Putting the bucket under does not allow the muck to collect on the tray. The last really big brick job we did we were making between 400-600 cuts a day..not with the HF saw..the MK. although I would like to put my HF saw to that kind of test I think that thing would take it. Its really not a bad saw for brick..tile...no luck for me..to wobbly= chipped glaze

    P.S. I like the "C" clamp

    Leave a comment:


  • rlf5
    replied
    Re: Begining dome construction

    I actually think you're a bit ahead of me. I still need to cut the other half of the floor bricks, and I still may add another 2" of insulation to the bottom. Still deciding on the latter task.

    Leave a comment:


  • Les
    replied
    Re: Begining dome construction

    Rl,

    We are at the exact same stage - the race is on!

    Leave a comment:


  • rlf5
    replied
    Re: Begining dome construction

    Finally got a break in the rain and decided to jump on some brick cutting. I got about half of the floor bricks cut so that the wall bricks fit around them. I'll do the rest tomorrow.

    Leave a comment:


  • rlf5
    replied
    Re: Begining dome construction

    Only bought 150. Although I didn't get enough...I'll probably need 50-75 more.
    Last edited by rlf5; 08-25-2007, 06:59 AM.

    Leave a comment:


  • asudavew
    replied
    Re: Begining dome construction

    Looks great!

    I'm starting to get jealous....because I haven't started yet!

    I am curious though, how many fire bricks did you buy?

    Leave a comment:


  • Kemo
    replied
    Re: Begining dome construction

    subscribed! thanks for posting.

    Leave a comment:


  • rlf5
    replied
    Re: Begining dome construction

    Finished cutting the rest of the surrounding floor bricks. I'll line them up a little better and then trace the ID onto the oven floor bricks so I can cut those.

    Leave a comment:


  • rlf5
    replied
    Re: Begining dome construction

    Originally posted by Les View Post
    RL,

    I noticed you have the saw pump in the tray. This was a source of great pain. The pump kept failing because of the "mud". I hung a 5 gallon bucket off the back of the saw and dropped the pump into that. Haven?t had a problem ever since. Just a suggestion.

    Les?
    Les

    Havn't had any problems yet, but I may just try your suggestion. Thanks!

    Leave a comment: