RC, and others that are to do the tie in of the dome bricks to arch. I did my first ones today. I found it time consuming for these bricks becuse they were not merely straignt cuts, angled, to tie in the two parts. The next will likely be easier though.
For this course 5 brick tie in, I started with foam blocks from an art store with the same dimensions as the fire bricks. Then I shaved the foam to desired shape. Once this was done, I mirrored the foam bricks to that of the fire brick as best as possible. I used the wet saw for bigger cuts, then shifted to detailed cuts, and the fine tuning using the grinder.
I plan to do half of course 6 this afternoon. Hopefully that gets accomplished, then I will finish 6 tomorrow.
RC, and others that are to do the tie in of the dome bricks to arch. I did my first ones today. I found it time consuming for these bricks becuse they were not merely straignt cuts, angled, to tie in the two parts. The next will likely be easier though.
For this course 5 brick tie in, I started with foam blocks from an art store with the same dimensions as the fire bricks. Then I shaved the foam to desired shape. Once this was done, I mirrored the foam bricks to that of the fire brick as best as possible. I used the wet saw for bigger cuts, then shifted to detailed cuts, and the fine tuning using the grinder.
I plan to do half of course 6 this afternoon. Hopefully that gets accomplished, then I will finish 6 tomorrow.
Comment