Re: It's time to go Vertical
I'm sorry to say I declined to go with the WISE advise of getting a 10" wet saw. I have a 7" wet saw I've been using, we built our house two years ago and we took over construction after the drywall stage. I got this saw then to help install over 2500 sf of tile and just couldn't justify the expense of another one. I'm having to cut from both sides so it's double the work but so far it's working for me.
Bevels are hard though, so I'm using a 12" miter saw with a masonry blade(they wear out rather fast). I've protected the motor with a plastic enclosure, but if it dies I always wanted a sliding miter saw anyway. This works ok for the bevels so far.
I've never said I was doing it the easy way. Using the wet saw for cuts when the brick is flat hasn't been a problem
It's time to go Vertical
Collapse
X
-
Re: It's time to go Vertical
RC,
Yeah, I live about 35 minutes from Lambeau, but I will be watching the win in70-degree comfort from my family room. There is no better stadium to watch a football game in the nation but at 1-degree f, I become less ethusiastic.
I actually grew up in New York, but 14 years around here have converted me.
Are you using the HFTools wet saw to cut your brick? If so in addition to the numbers above I could provide a few drawing that will make cutting them on the saw a breeze.
JimLeave a comment:
-
Re: It's time to go Vertical
RC,
Yeah, I live about 35 minutes from Lambeau, but I will be watching the win in70-degree comfort from my family room. There is no better stadium to watch a football game in the nation but at 10-degrees I become less ethusiastic. I actually grew up in New York, but 14 years around here have converted me.
Are you using the HFTools wet saw to cut your brick? If so, in addition to the angles above I could provide a few drawings that will make cutting them on the saw a breeze.
JimLeave a comment:
-
Re: It's time to go Vertical
Well no work done that last two days, it hasn't hit 40 degrees yet. In the middle of Texas we did have an accumulation of 1-2" inches of snow - well at least in the valleys on the roof. The rest liquidify on contact. Driving tonight will be fun for these Texans. Sounds like the front movement will hit you up in the North and Northeast this weekend. Should be an interesting game in Green Bay on Sunday. Favre sure looks like he is having funLeave a comment:
-
Re: It's time to go Vertical
Jim, That is such a kind offer and I would gladly take you up on it. When you say bevel are you talking about the taper on the bottom of the brick or did you figure out how to compensate for that inverted V?
So far my BEST FRIEND has been an angle grinder with a diamond blade! I have to adjust each brick one at a time but so far it is working for me.
I'll rewatch your video for insperation. thanksLast edited by RCLake; 01-18-2008, 01:55 PM.Leave a comment:
-
Re: It's time to go Vertical
RC,
I had responded to a post you had made on my "vent finished" thread, but based upon your post on the "my indespensible tool" thread, I don't think you saw it so I thought I would repost it here, it read:
"RC,
Thanks for the kind words. Each issue as they arise? - - The only way to go. And for me, nearly every issue was attached to tying the dome to the arch. As I mentioned to Acoma, the only way I could get through it was to prototype by carving pieces of foam insulation to fit, then transfer the cuts to the brick. The good news is that once past the arch things move very quickly.
If it helps, I have the bevel and angle calcs for subsequent courses and would be happy to send those along.
Jim
"
To explain a bit further, I had used 4'x8'x2" insulation board cut to fit for the forms for the arch, leaving me quite a bit extra kicking around. After going through a countless number of scrap brick trial and errors requiring multiple trips to and fro the saw, I took some of the left over foam, cut it to the (very) approximate size and then sliced it on a band saw in 1/4" thickness(could also be cut with the cool foam cutter hft sells if you don't have a bandsaw - but everyone should have a band saw). The 1/4" thickness just made it easier to cut and trim to fit the space being filled. I would leave that one in place and place the next 1/4" piece on top and trim and so on until eventually I had the thickness of the brick, with each trim of the foam make sure you are leaving room for mortar. I would then press all together pull out, hold firm, tape all together. Once held together I would then take back to the space to make certain I was happy with the fit, carve off excess, tape on any additions that was needed and then transfer the dimensions to the brick. I have attached a rather lame illustration that may or may not make clear what I am talking about. But the process was the only way I could get a tight fit between bricks.
Take a look and you will see that on course 7 I cheated a bit by cutting into the arch and then filling in the gaps with refmix. OvenCamHiRes. The brick pieces cut would have been little more than veneer and I feared they would fall out at some point so I opted to just fill with mortar.
On course 8 because I was cutting less than 2" into the arch, instead of cutting the bricks on the course to fit the arch, I ground down the arch, using my trusty $19 HFTools grinder. Made very quick work of that course. And then is was like riding a bike down hill. As I said above once you are past the arch things go much faster.
Your latest shots look great. The front corners of the flaired arch can be a bit trickey to get a nice line. If you need some help when you get to that point drop a note.
Jim1 PhotoLeave a comment:
-
Re: It's time to go Vertical
Woke up this morning and the basin for the wet saw was a slab of ice. At least the pail for the pump was empty. Guess I'll do things I have been putting of because of this crazy project
Leave a comment:
-
Re: It's time to go Vertical
Not harder, just hurts more. At least it did for me!Leave a comment:
-
-
Re: It's time to go Vertical
Looks beautiful, Dad! (WFO guys, I'm RClake's son in Dallas, hence the 'Dad.') Nice to see what you're working on even when I'm not there.
~CraigLeave a comment:
-
Re: It's time to go Vertical
Well I mortared down the fifth row today, I've reduced the amount of mortar I mix up to the amount that fills a Cool Whip tub. I can get about 9 bricks done so it takes 3 batches per row. It isn't dry at the end like it used to be.
Before proceeding to the next row I think it's time to do a lot of cleanup since there is still enough room to get in. I can see soon that won't be the case!1 PhotoLeave a comment:
-
Re: It's time to go Vertical
OK, I agree with George about Wet Saw in the 30's, but I am willing to work in the tent when the outside is in the 20's, no lower.Leave a comment:
-
Re: It's time to go Vertical
45 degrees is easy. 35 is hell. Ice in the pump's water tray......
Leave a comment:
-
Re: It's time to go Vertical
My hats off to you, I put off starting until our heat was gone. I'm from ND and WAS use to the cold, but no way would I be doing it under a tent in the winter!
I just can't imagine using a wet saw when it is below 45.
Looking forward to your pictures, I'm posting mine as things get done and just hoping that it continues.Leave a comment:





Leave a comment: