              For those that have completed a doghouse style oven - Would you recommend 3" of ceramic blanket or 2" blanket and loose fill with vermiculite? I plan to start wrapping this baby and building an enclosure soon and just wanting some input from those that have been down this road?

              Thanks in advance.

              Comment

              • Saluki
                Laborer
                • Aug 2011
                • 89

                #67
                For anyone interested. It took 200 bricks nearly exactly to build the dome/vent/landing. Standard size firebricks.

                Comment

                • Saluki
                  Laborer
                  • Aug 2011
                  • 89

                  #68
                  And another question - If I go with the vermiculite - Should I loose fill or go with a vermicrete blend and cover the blanket within the enclosure?

                  Comment

                  • Saluki
                    Laborer
                    • Aug 2011
                    • 89

                    #69
                    Got the anchor plate mounted today.

                    Comment

                    • Saluki
                      Laborer
                      • Aug 2011
                      • 89

                      #70
                      Well, I guess insulation is next, likely early next week. I have tow boxes of this, I'll see how far it gets me and decide from there whether to get more blanket or fill with loose vermiculite.

                      Comment

                      • Gulf
                        Member Moderator
                        • Sep 2011
                        • 3883

                        #71
                        Two 50 square feet boxes should do you just fine.
                        Joe Watson " A year from now, you will wish that you had started today" My Build Album / My Build

                        Comment

                        • Saluki
                          Laborer
                          • Aug 2011
                          • 89

                          #72
                          Thanks for the response Gulf - I got it covered with 3 complete layers, almost 4.

                          Comment

                          • Saluki
                            Laborer
                            • Aug 2011
                            • 89

                            #73
                            This was my first attempt with steel studs, they are pretty nice to work with, although a bit weak until you get them covered. This was my first attempt to frame the walls and ceiling.

                            Comment

                            • Saluki
                              Laborer
                              • Aug 2011
                              • 89

                              #74
                              Wife thought the slant roof would look like a big commode in the back yard, so that was torn down for a gable roof.

                              Comment

                              • Saluki
                                Laborer
                                • Aug 2011
                                • 89

                                #75
                                This is getting closer.