Thanks for the feedback Utah... my thought on the 1/3 vs 1/2 was the mortar joints being so close... they don’t line up but they are close. Is that OK??? I’m all about less work.
On the out-of-level slab, yes concrete and the Calsil will go on top. Curious, when you guy talk about fire clay, can that be substituted with the brick dust after it’s dried out?
Thanks, Mikie V.
On the out-of-level slab, yes concrete and the Calsil will go on top. Curious, when you guy talk about fire clay, can that be substituted with the brick dust after it’s dried out?
Thanks, Mikie V.