Re: Les' Build
I mixed it DRY first, then the water...in a wheel barrow, was either 5-1 or 6-1. I used chicken wire, and yes, it is a bitch to get it to stay in place. Be sure to start at the bottom, pack it in the full depth that you want and gradually work your way up. I found this process to be one of the most tedious of the entire build - even though it only took a couple of hours, seemed like days......you just have this thought in your head that you can slap in on and be done in no time.......NOT TRUE.
Hang in there...have a beer, pack it in, have another beer.........repeat till complete.
RT
I mixed it DRY first, then the water...in a wheel barrow, was either 5-1 or 6-1. I used chicken wire, and yes, it is a bitch to get it to stay in place. Be sure to start at the bottom, pack it in the full depth that you want and gradually work your way up. I found this process to be one of the most tedious of the entire build - even though it only took a couple of hours, seemed like days......you just have this thought in your head that you can slap in on and be done in no time.......NOT TRUE.
Hang in there...have a beer, pack it in, have another beer.........repeat till complete.
RT
Comment