Originally posted by mongota
View Post
There will be another layer of bricks with 1/4" s.s. bolts to tie into the stainless flue, and a sloped cast cement top to shed water and snow off the whole thing.
Here are some photos:from earlier today. I started to add perlite to the base of the dome. Its quite crumbly when wet, even at 8:1 perlite to cement ratio, with 2 parts water added to the mixed dry ingredients in the wheelbarrow. I mixed just a little to test it, seemed to be a good consistency with no pooling of water at the bottom. I'm glad I tested since adding any more perlite to the base would have slumped-off the top. I got about 4" high so far, we'll see how it dries tomorrow and whether I need to get some chicken wire to hold the perlite on to the vertical surfaces till I reach the more tapered, horizontal sections of the dome...
next day edit.... the perlite stiffenned-up quite nicely overnight, should be able to continue adding today..today, but i got a roll of chicken wire to see if that will let me work a little faster by providing something the perlcrete can hold onto.
Comment