So I have the side view ready and also less confidence in some elements of this drawing. First note two possible inset depths...does either work? If not, what is the guiding design principle?
Second - I'm wondering about the placement of the chimney landing - how far forward or back should it be? I drew in a possible chimney placement aligned just forward of the OR for the oven dome at it's base.
Final note, I'm assuming the oven dome starts with a course of sailors. Basically first course is 4.5 inches high, which clears the oven floor by 2 inches. Also assumes the floor bricks are cut to the IR with first course placed around the perimeter. I understand that for the indispensable tool to work correctly the pivot point needs to be positioned below the top of the first course. Make sense?





Is the eraser one of the greatest inventions ever?!