I put the 36" T there to visualize reach with a pizza peal. The plan calls for a decorative arch outside the chimney landing which I planned at 4.5" deep (another half brick beyond this model) but I suppose that is not required to be that deep.
The landing is not to scale, but gives a close idea of my thoughts for eventual placement and size. Actually, as I look at it I realize that I presume on my initial plan that the chimney landing hs to be "outside" the door reveal so that the oven can be fully sealed when the door is closed, right?
In other news, a walk this afternoon inspired me to name this project after or neighborhood Park. The entrance to Mount Tabor Park, which I am told is the only dormant volcano inside the city limits in the US is located about 3 blocks from our house. It's 176 acres and features three beautiful open reservoirs that used to supply city drinking water for Portland, plus old growth forest, and a public concert venue located inside the volvanoe's caldera!
As I was walking on a beautiful spring day I saw a vision of my future oven clad in a mosaic tile depictions of the park, reservoirs and forest from each of the cardinal directions.





Leave a comment: