hi everyone, love the site and forums.
started work on my oven (105cm internal)
have my stand up with use of left over bricks from my new house
and considering the wet and cold weather I was wondering how long should I wait to put slab on top?
stand was build 5 days ago but mortar is still visibly darkish other then top few levels thanks to shocking weather.
started work on my oven (105cm internal)
have my stand up with use of left over bricks from my new house
and considering the wet and cold weather I was wondering how long should I wait to put slab on top?
stand was build 5 days ago but mortar is still visibly darkish other then top few levels thanks to shocking weather.
Comment