After I promised a friend that I'd cater his wedding at my place with a WBO I need to build it in only a couple weeks! Drawings attached, feedback please!! (Google Doc) Frame and Hearth PIC
Technical Drawing and Cut List
Solid Works Ass.
The Plan:
-36" Forno Bravo Pompeii Kit
-1.5"x 0.125wall Steel frame (Attached Solid Works Drawing of geometry)
-59" x 64" x5.5" hearth poured at the same time as the pad
-build oven on steel frame in garage
-Low vault Tuscan igloo (Modified IT with lazy susan)
-Slow dry the oven in the garage with woodstove lit, yes during the summer.
-use backhoe to move hearth & oven into place once pad and oven are completely dry
-Series of drying fires
I have some masonry experience,
Out of my mind to try this in 3 weeks? is likely that I'll be able to move the hearth/stand/oven without cracking everything?
Technical Drawing and Cut List
Solid Works Ass.
The Plan:
-36" Forno Bravo Pompeii Kit
-1.5"x 0.125wall Steel frame (Attached Solid Works Drawing of geometry)
-59" x 64" x5.5" hearth poured at the same time as the pad
-build oven on steel frame in garage
-Low vault Tuscan igloo (Modified IT with lazy susan)
-Slow dry the oven in the garage with woodstove lit, yes during the summer.
-use backhoe to move hearth & oven into place once pad and oven are completely dry
-Series of drying fires
I have some masonry experience,
Out of my mind to try this in 3 weeks? is likely that I'll be able to move the hearth/stand/oven without cracking everything?