Announcement

Collapse
No announcement yet.

My first WFO design, any comments before I build?

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • #46
    Mark, I doubt if anybody here can tell you what sufficient is, since we can't "feel" how rigid your stand is and some have cautioned about using wood in the first place. That's why I used the term "overbuild" - it's so hard to know what the "minimum necessary" is, so most either overbuild or follow tried and true designs. david s said his 21" oven weighs in around 250 kilos, so at a minimum I'd find a way to proof load the stand and see if there is any wiggle or horizontal motion. If there is you need to brace better. If it feels stout under load you just need to make sure the wood does not degrade over time. Also since you are building your oven in what might be a temporary location thinking about how to pick it up and move it might be prudent, both in the case of a potential relocation or any repairs/upgrades to the stand.
    My build thread
    https://community.fornobravo.com/for...h-corner-build

    Comment


    • #47
      Originally posted by Mark1986 View Post
      Thanks for the advice on safety! I postponed pouring the concrete and focused on the stand. I couldn't find cross bar easy/fast enough. So I decided to add heavy duty steel corner plating on all sides and I added additional bars 6.5 x 6.5 cm below (see photos). Is this sufficient?

      cheers!
      Hi Mark
      You're asking a lot of those little steel brackets. The force near the hinge point, i.e. the single bolt location, is pretty big. No-one can say if they'll hold or not, but I would consider (timber) cross bracing essential if I was building it.
      Regards,
      Mark
      Click image for larger version  Name:	cross-bracing.jpg Views:	0 Size:	200.4 KB ID:	438530
      Attached Files
      My 42" build: https://community.fornobravo.com/for...ld-new-zealand
      My oven drawings: My oven drawings - Forno Bravo Forum: The Wood-Fired Oven Community

      Comment


      • #48
        Originally posted by MarkJerling View Post

        Hi Mark
        You're asking a lot of those little steel brackets. The force near the hinge point, i.e. the single bolt location, is pretty big. No-one can say if they'll hold or not, but I would consider (timber) cross bracing essential if I was building it.
        Regards,
        Mark
        Click image for larger version Name:	cross-bracing.jpg Views:	0 Size:	200.4 KB ID:	438530
        I feel confident that the system won't buckle when I pour in the concrete. After this is done, I'l test if there is any movement in the frame. If so, I will add the cross bracing. Thanks for the advice!

        Comment


        • #49
          Good luck!
          My 42" build: https://community.fornobravo.com/for...ld-new-zealand
          My oven drawings: My oven drawings - Forno Bravo Forum: The Wood-Fired Oven Community

          Comment


          • #50
            Today I poured in the concrete, and I'm quite happy with the result, as this was my first time!

            Pouring:
            - adding 25kg and 3 liters of water in a bucket and mix it
            - pour it in the box
            - trowel the layer
            - repeat

            Removing air bubbles
            - pounding the whole box with a rubber hammer, including bottom

            Reinforcing
            - Added thick rebar at 1/3 of the slab

            Curing
            - After 6 hours I started curing the concrete by pouring over water every couple of hours and I cover it with a plastic tarpaulin

            What stood out:
            - At the recommended 2.3 liters of water the concrete felt really dry, added 700ml more

            Any comments on my progress?




            Comment


            • #51
              Originally posted by Mark1986 View Post
              Today I poured in the concrete, and I'm quite happy with the result, as this was my first time!

              Pouring:
              - adding 25kg and 3 liters of water in a bucket and mix it
              - pour it in the box
              - trowel the layer
              - repeat

              Removing air bubbles
              - pounding the whole box with a rubber hammer, including bottom

              Reinforcing
              - Added thick rebar at 1/3 of the slab

              Curing
              - After 6 hours I started curing the concrete by pouring over water every couple of hours and I cover it with a plastic tarpaulin

              What stood out:
              - At the recommended 2.3 liters of water the concrete felt really dry, added 700ml more

              Any comments on my progress?



              Nice. Also, I like your shirt! LOL. (Yes, I'm a Saffa too.)
              My 42" build: https://community.fornobravo.com/for...ld-new-zealand
              My oven drawings: My oven drawings - Forno Bravo Forum: The Wood-Fired Oven Community

              Comment


              • #52
                Originally posted by MarkJerling View Post

                Nice. Also, I like your shirt! LOL. (Yes, I'm a Saffa too.)
                Haha nice! I'm a Dutch rugby player, definitely fan of the springbokken!

                Comment


                • #53
                  Originally posted by Mark1986 View Post

                  Haha nice! I'm a Dutch rugby player, definitely fan of the springbokken!
                  Aha! Cool. What team do you play for?
                  As an aside - Some years back I spent a week or so in Amsterdam and surrounds and managed to get by quite well with Afrikaans. Most people simply thought I was a poorly educated country bumpkin! LOL
                  My 42" build: https://community.fornobravo.com/for...ld-new-zealand
                  My oven drawings: My oven drawings - Forno Bravo Forum: The Wood-Fired Oven Community

                  Comment


                  • #54
                    Originally posted by MarkJerling View Post

                    Aha! Cool. What team do you play for?
                    As an aside - Some years back I spent a week or so in Amsterdam and surrounds and managed to get by quite well with Afrikaans. Most people simply thought I was a poorly educated country bumpkin! LOL
                    I play for a club in the north, Groningen. We play at the highest level, but that isn't anything compared to rugby countries

                    I love Afrikaans! Haha well that's their poor judgement then. It is a bit like you travel back in time when you hear it, that is true.

                    Comment


                    • #55
                      david s I'm going to start pouring the perlite concrete insulation layer and the homebrew dome this week. Below you'll find what I'm planning to do.

                      Perlite insulation layer
                      - 5:1 ratio perlite to portland cement
                      - I found a document describing how much water you should use. See attachment.
                      - I will mix the water and cement first and then add the perlite
                      - Then I will pour into the wooden box
                      - I will cover it with plastic and let it dry for at least 7 days

                      Questions on perlite layer
                      - Is covering with plastic enough, or should I wet cure?
                      - Are the steps I'm following correct?

                      Homebrew dome
                      - sand:cement:lime:fireclay 3:1:1:1 ratio + polypropylene fibres
                      - I couldn't find any information on how much water to use. So I will use sufficient for it to look a bit wet, but still stay on a trowel at a near 90 degrees angle.
                      - I will cast it over an exercise ball
                      - Starting with the first 10-15cm and waiting until it is fixed a bit to make it less saggy when I move up
                      - Once done I'll cover it with a plastic sheet and let it dry for at least 7 days
                      - Then I will start small curing fires

                      Questions on the homebrew dome
                      - Is there more precise information on water usage?
                      - Home many polypropylene fibres should I use?

                      Any general comments on my plans?

                      Cheers!


                      Comment


                      • #56
                        The water requirement for perlcrete can vary, depending on whether there’s moisture already in it and the grade used. Fine grade requires more (I use a medium grade and find 50/50 perlite/vermiculite works better. Don’t use a mixer as it tends to stick to the blades and sides of the mixer as well as the tendency to abrade the grains. I find a barrow and spade much better. I also find mixing the dry materials together first then add around 1/3 of the water, mix, add another 1/3 of water, mix and add the last 1/3. The water should just pool a little in the bottom of the barrow. Continue to mix for a further 3 or 4 mins and the water should be absorbed. If it hasn’t add a little more dry material. There’s so much free water in a vermicrete or perlcrete mix that holding the moisture in it is not necessary. Removing it is harder and more important.

                        Using a gym ball requires fairly extensive formwork under the bottom half and it needs to be strong enough so the weight of the mix won’t distort it. Otherwise it won’t sit level on the oven insulation or oven floor. You also have the problem of moving a very heavy dome off the formwork and into position risking damage. For these reasons casting in situ over a sand castle mould is far simpler. About a handful of the very fine polypropylene fibres for every 10 litres of dry castable. They require around double normal mixing time to disperse. Use the
                        ”ball up” test for correct water addition.
                        Moisture should be held in the casting for at least a week, so keep it covered. Do not begin any drying fires at this stage or you’ll damage the casting. Allow a minimum of a week drying in the sun and wind before proceeding with insulation. The drying fires are far safer to the casting if done with the casting insulated.

                        There are quite a few well documented castable homebrew builds on this site that would help you.
                        Kindled with zeal and fired with passion.

                        Comment


                        • #57
                          david s
                          Originally posted by david s View Post
                          The water requirement for perlcrete can vary, depending on whether there’s moisture already in it and the grade used. Fine grade requires more (I use a medium grade and find 50/50 perlite/vermiculite works better. Don’t use a mixer as it tends to stick to the blades and sides of the mixer as well as the tendency to abrade the grains. I find a barrow and spade much better. I also find mixing the dry materials together first then add around 1/3 of the water, mix, add another 1/3 of water, mix and add the last 1/3. The water should just pool a little in the bottom of the barrow. Continue to mix for a further 3 or 4 mins and the water should be absorbed. If it hasn’t add a little more dry material. There’s so much free water in a vermicrete or perlcrete mix that holding the moisture in it is not necessary. Removing it is harder and more important.
                          I mixed and poured the perlite concrete in the box yesterday. It went without any big problems. I did use about 3 liters less water in the perlite concrete mix than was stated in the table I posted. I kept adding water and mixing until the mixture looked and felt moist, but no water remained at the bottom. I'm a bit worried that I didn't use enough water, but that's only based on the table I found.

                          Another thing is that it is quite hot here these days, yesterday 23 celsius and today 32 celsius. I did cover the pizza oven stand with a plastic sheet and put a garden umbrella next to it (see photos). I hope that the moisture didn't evaporate too quickly. Do you think this happens in these conditions? Any remedies if this happened?

                          How hard should the top layer be of the perlite concrete? Will it be a little brittle? Like some grains come loose? Or will this be a sign that it didn't set properly?


                          Using a gym ball requires fairly extensive formwork under the bottom half and it needs to be strong enough so the weight of the mix won’t distort it. Otherwise it won’t sit level on the oven insulation or oven floor. You also have the problem of moving a very heavy dome off the formwork and into position risking damage. For these reasons casting in situ over a sand castle mould is far simpler. About a handful of the very fine polypropylene fibres for every 10 litres of dry castable. They require around double normal mixing time to disperse. Use the
                          ”ball up” test for correct water addition.
                          Moisture should be held in the casting for at least a week, so keep it covered. Do not begin any drying fires at this stage or you’ll damage the casting. Allow a minimum of a week drying in the sun and wind before proceeding with insulation. The drying fires are far safer to the casting if done with the casting insulated.

                          There are quite a few well documented castable homebrew builds on this site that would help you.
                          Tomorrow I'm going to think about changing the way of casting the dome, I'll get back to you!
                          Last edited by Mark1986; 06-17-2021, 03:50 PM.

                          Comment


                          • #58
                            Drying conditions are dependent on temperature, air movement (wind) and humidity, so a combination of these will give you the outcome. Covering it will largely prevent the water loss. Not sure what ratio you used but a 5:1 by volume is considered the strength requirement for under floor insulation for an oven. The mix needs to be tamped into the mould and troweled flat at the top. There should not be any loose grains on the surface.
                            Last edited by david s; 06-17-2021, 06:49 PM.
                            Kindled with zeal and fired with passion.

                            Comment


                            • #59
                              Originally posted by david s View Post
                              Drying conditions are dependent on temperature, air movement (wind) and humidity, so a combination of these will give you the outcome. Covering it will largely prevent the water loss. Not sure what ratio you used but a 5:1 by volume is considered the strength requirement for under floor insulation for an oven. The mix needs to be tamped into the mould and troweled flat at the top. There should not be any loose grains on the surface.
                              david s


                              I used the 5:1 ratio. I don't know how much pressure I should've given while finishing it, but I did trowel it and did press it in a bit while doing it. Fingers crossed then. Should it be set in about three days, in order to see if the end result will be good?

                              Comment


                              • #60
                                3 days should see it about as hard as it's going to get, but it'll need plenty more to dry out, see drying experiment.

                                Vermicrete insulating slab PDF.pdf
                                Kindled with zeal and fired with passion.

                                Comment

                                Working...
                                X