42" Build Underway in Central Alabama

Collapse
X
 
  • Time
  • Show
Clear All
new posts
  • edsiajb
    Apprentice
    • Mar 2014
    • 143

    #61
    Re: 42" Build Underway in Central Alabama

    Comment

    • edsiajb
      Apprentice
      • Mar 2014
      • 143

      #62
      Re: 42" Build Underway in Central Alabama

      For the final course I used a bottle jack and a Frisbee. The Frisbee was the closest item I could find around the house that had a slight contour that I needed. I was able to flex the center of the Frisbee upward slightly with the jack and get the exact contour I was looking for. In this regard, the jack and Frisbee seemed like the perfect solution.

      Comment

      • edsiajb
        Apprentice
        • Mar 2014
        • 143

        #63
        Re: 42" Build Underway in Central Alabama

        The final course in place:



        Plug tapped into place! For me that was one - happy - moment!

        Comment

        • edsiajb
          Apprentice
          • Mar 2014
          • 143

          #64
          Re: 42" Build Underway in Central Alabama

          So the final course and keystone/plug was not the tightest fit, but it was about the best I could do.



          Template removed! Woohoo!

          Last edited by edsiajb; 08-19-2014, 03:49 AM.

          Comment

          • NCMan
            Master Builder
            • Jan 2014
            • 846

            #65
            Re: 42" Build Underway in Central Alabama

            Congrats on the pluggin'!! I also used a bottle jack in a similar fashion at the very end. Worked great for me. Great feeling to finish the dome, isn't it?
            My Build:
            http://www.fornobravo.com/forum/f8/s...ina-20363.html

            "Believe that you can and you're halfway there".

            Comment

            • edsiajb
              Apprentice
              • Mar 2014
              • 143

              #66
              Re: 42" Build Underway in Central Alabama

              Originally posted by NCMan
              Congrats on the pluggin'!! I also used a bottle jack in a similar fashion at the very end. Worked great for me. Great feeling to finish the dome, isn't it?
              Thank you - and yes, it is a great feeling! I was worried about the final keystone/plug. But in the end, I simply needed it to be 2" on the outside and 1" on the inside.

              I took a 1/4 brick and drew a 2" circle centered on one end, and a 1" circle centered on the opposite end. I then just sawed away everything outside the circles. It worked so well and I was so happy that I forgot to photograph the plug before I hammered it in...

              And when I did hammer it in, I was blown away by the fit.
              Last edited by edsiajb; 08-15-2014, 04:29 AM.

              Comment

              • UtahBeehiver
                Member Moderator
                • May 2012
                • 5260

                #67
                Re: 42" Build Underway in Central Alabama

                Nice work on the dome and plug and use of the brackets for holding the bricks.
                Russell
                https://photos.google.com/album/AF1Q...L9lr_UnUgJbF3Z

                Comment

                • Novaslo
                  Journeyman
                  • Dec 2013
                  • 279

                  #68
                  Re: 42" Build Underway in Central Alabama

                  THAT is a work of art.....You will be appreciating that, everytime you cook something.

                  All of your friends will ask you, who you had build it for you or if you had it delivered that way.

                  Be ready to talk Pizza Oven, a lot!!!!
                  Darin I often cook with wine, sometimes I even add it to the food... WC Fields Link to my build http://www.fornobravo.com/forum/f8/4...-ca-20497.html My Picasa Pics https://picasaweb.google.com/1121076...eat=directlink

                  Comment

                  • edsiajb
                    Apprentice
                    • Mar 2014
                    • 143

                    #69
                    Re: 42" Build Underway in Central Alabama

                    Thank you all for the kind and encouraging comments.

                    The dome will be insulated and boxed in up to a sloping shed roof that comes off the side of a pavilion. But that roof is not there yet, and neither is the pavilion! And I really need that roof to be there before I start cutting the steel studs.

                    So I have another big project to complete before I can do much more work on the oven. I can be working on the landing and entry arches, but cannot do much with the chimney (again awaiting the roof).

                    Building the pavilion should give me plenty of time to cure and dry out the dome.

                    Today is exactly 3 months since this project was started. It would be great to complete it in 3 more months, but that may be a pipe dream heading into the craziness of Fall with three teenage children.

                    Comment

                    • SteelandStone
                      Laborer
                      • Sep 2012
                      • 71

                      #70
                      Re: 42" Build Underway in Central Alabama

                      Originally posted by edsiajb
                      I've been trying to wrap my mind around the best way to keep my bricks from sliding when I get to the courses with steeper angles. I've seen several different solutions others have used. I decided to try making a "clip" to put over the brick (surely someone has done this before - but I couldn't find any related posts).

                      I had some Simpson Strong-Tie straps left over from a previous project. I bent them to snap over the brick - and hold against the back side of the brick on the course below.

                      It was so simple and easy, I decided to post photos here:




                      I just ran across this post, I made some very similar clips last week for mine also. They work great and have no problem holding the bricks in place.
                      Nice looking build and congrats on the pluggin of the dome.
                      Last edited by SteelandStone; 08-15-2014, 10:15 AM.
                      Start of the Outdoor Kitchen Thread http://www.fornobravo.com/forum/f35/...ild-18433.html

                      Oven Build Thread http://www.fornobravo.com/forum/f8/j...ild-20791.html

                      Comment

                      • edsiajb
                        Apprentice
                        • Mar 2014
                        • 143

                        #71
                        Re: 42" Build Underway in Central Alabama

                        Well, I haven't posted in a few months. My project was delayed by Alabama heat, health issues, and managing three teenagers (with all of their extracurricular activities) during a busy Fall season.

                        I will be posting some photos shortly on the slooooow progress made regardless of the obstacles to my schedule...

                        Comment

                        • edsiajb
                          Apprentice
                          • Mar 2014
                          • 143

                          #72
                          Re: 42" Build Underway in Central Alabama

                          Pavilion details (framed with 6" x 6" timbers):

                          [/URL]

                          [/URL]

                          [/URL]

                          Comment

                          • edsiajb
                            Apprentice
                            • Mar 2014
                            • 143

                            #73
                            Re: 42" Build Underway in Central Alabama

                            [/URL]

                            [/URL]

                            [/URL]

                            Comment

                            • edsiajb
                              Apprentice
                              • Mar 2014
                              • 143

                              #74
                              Re: 42" Build Underway in Central Alabama

                              [/URL]

                              [/URL]

                              [/URL]

                              Comment

                              • edsiajb
                                Apprentice
                                • Mar 2014
                                • 143

                                #75
                                Re: 42" Build Underway in Central Alabama

                                [/URL]

                                [/URL]

                                Comment

                                Working...