Thanks for the support gents!
RandyJ The curing fires are going to be in spring. It's getting pretty wet here now in Autumn and I don't see much sense in trying to keep half-fitting blankets dry in that weather. I'll use the winter to cast a gallery-->chimney connection and then be ready to fit it and insulate the oven in spring... and then finally pizza time hopefully!
You're only seeing the 'after cleaning' pictures now. I've attached some for during the building process and after removal of the form. Much less clean! With the dome arch I waited 24h before removing the form, after which it was much harder to clean the inside. This time it went a lot easier with more fresh mortar after 6-8hrs. I hope yours is going to be fine too!
In the end UtahBeehiver is right of course: it's all going to get black, so no one is going to notice anyway
With respect to the vent opening: as long as it's larger than the chimney cross sectional area it should be OK. Mine might actually be too big, but I wanted to capture also a significant width of the barbecue area to ensure the smoke will also go in. Now I'll have to make a bigger/higher transition piece not to get the angles too flat.
RandyJ The curing fires are going to be in spring. It's getting pretty wet here now in Autumn and I don't see much sense in trying to keep half-fitting blankets dry in that weather. I'll use the winter to cast a gallery-->chimney connection and then be ready to fit it and insulate the oven in spring... and then finally pizza time hopefully!
Originally posted by nlinva
In the end UtahBeehiver is right of course: it's all going to get black, so no one is going to notice anyway
With respect to the vent opening: as long as it's larger than the chimney cross sectional area it should be OK. Mine might actually be too big, but I wanted to capture also a significant width of the barbecue area to ensure the smoke will also go in. Now I'll have to make a bigger/higher transition piece not to get the angles too flat.