Re: Pizza Bob's 42" Build
Here is the last image...
Here is the last image...
You might catch me...I really wanted to fire this up before the winter but it's not gonna' haappen. It hasn't been too nasty here but that storm hitting you now will catch up to us tomorrow. I have bricks cut for my eigth course and I want to get those in place before the winter and then I think I'm done until the spring
.
My "real job" has just been keeping me too busy to dedicate enough time to get this done before the snow. I'm not complaining but I am...
I also broke-out the wet-dry vac and cleaned all loose mortar inside and out. If there was a mortar police I would have been fined over and over for wasting mortar! I removed the protective wood floor covering too in order to clean everything. I almost forgot what my herringbone floor looked like! It looked better than I remembered.
The soldiers have always been referred to as soldiers in this forum.
I just followed suit...
These guys did a GREAT job on the wall! It's 90 feet long and 3 feet tall and then it transitions up to 5 feet tall and 30 feet long. I was able to get 25 extra feet of flat land in the back yard. The steps will eventually lead up to a stone patio where the pizza oven will be located. They did all this in 7 days! It's 50% stone from our yard - all New England fieldstone. The rocks above the wall will be the location for another retaining wall that will connect to the pizza oven. Then the pizza oven will be finished in this same (smaller sizes) fieldstone.
Comment