Re: New pre-cut kit build in Adelaide
Time for a update, started on oven build now I have completed render (stucco) of patio in area of WFO. Cut calcium silicate board to size and laid straight on top of hearth slab. Covered with aluminium foil to prevent moisture being drawn out of heat bank too fast whilst curing.
Next made form work for refactory castable heat bank 25mm thick, mixed, poured and let cure for three days.
Time for a update, started on oven build now I have completed render (stucco) of patio in area of WFO. Cut calcium silicate board to size and laid straight on top of hearth slab. Covered with aluminium foil to prevent moisture being drawn out of heat bank too fast whilst curing.
Next made form work for refactory castable heat bank 25mm thick, mixed, poured and let cure for three days.