Re: 30" Pompeii in Minneapolis
Post #33, picture #3 shows what I have. The 1&3 course has the arch brick as a part of the dome (as shown on course 1). The 2&4 course has dome bricks on top of this arch brick. So the arch is built into the dome wall. From the outside joints, it seems that they are just mortared to the outside, but they extend into the dome. At least that's what it seems to me. Am I correct?
Ok, I want an inward reaching inner arch. That's been my plan. Cut the arch bricks first then, right?
Originally posted by mrchipster
View Post
Originally posted by mrchipster
View Post
Comment