Originally posted by SableSprings
View Post
Originally posted by david s
View Post





Another option to David S suggestion above is to drill holes in your support board and push the tubing pieces just through that board. I would cut the tubing off just below the top projected level of the concrete. I know this may sound stupid, but take some bread wrapped in a bit of plastic wrap and make a taller "cork" for each tube that will stand above the finished concrete.

Comment