Thanks cobblerdave and Gulf 
	
		
			
			
				
	
Yeah, I realize that now, but not before I poured my slab (5' x 5'). I will be cutting 4 inches off of two blocks for each row. Attached is a sketch of the layout of my first row. I will be staggering these 3/4 blocks, so I won't necessarily have perfectly lined up cores, hence the quikwall (surface bonding cement). I will still fill the corners and every other core where I can, but I will also be relying on the quikwall. I am adding some coloring to the quikwall as well, so hopefully that can also suffice as a finishing layer for the base.
							
						
					