Thanks Gulf . Do you have a cap/cage or something similar to cover the vent as it sticks up to prevent it from being broken off by climbing children or falling branches? I'm sure I am overthinking this, but I do have a 6-year-old who climbs everything.
Announcement
Collapse
No announcement yet.
42" build in McPherson KS
Collapse
X
-
Do you have a cap/cage or something similar to cover the vent as it sticks up to prevent it from being broken.......?Joe Watson " A year from now, you will wish that you had started today" My Build Album / My Build
- 1 like
Comment
-
Made some more pizza on Thursday night. The oven was still around 300 F this morning while I was doing my first coat of stucco. I didn't get all the chicken wire covered with the first coat, the stucco seemed to just squish right through. Should be able to cover it with the next coat. I cleaned my trowels/buckets and immediately fired up the oven and had some more pizza tonight, The still-wet stucco was cold to the touch all night while the oven was burning a hot 800 F.
- 1 like
Comment
-
Originally posted by david s View PostYou can increase the strength of the outer stucco shell substantially by holding the moisture in that layer for a week. I do this by wrapping the whole oven in cling wrap.
Comment
-
Gulf did you do the full 3 layer stucco schedule? Just wondering if I need the "finish" layer since I will be bricking it all in anyway. It feels strong after the scratch and brown layers. Does the finish layer provide anything more than just a little more mass?
Comment
-
david s I fought the cling wrap in the wind, but I lost the battle. I hydrated it the best I could and covered it with a tarp. Should I continue misting it for the next week or so?
Comment
-
I did three layers, but not like the stucco schedule. The mesh that I used was spaced from the vermicrete. I skipped the usual scratch coat and smoothed each layer.. Between layers I used an acrylic fortifier bonding agent. It was also used to replace a lot of the water in each layer. Though, I used a stucco mix, (with some added portland) my stucco layer is more like a ferocrete.
.....It feels strong after the scratch and brown layers. Does the finish layer provide anything more than just a little more mass?.....
Also, the tarp will be ok. Just keep it covered to protect it from the sun and drying breezes. It needs the moisture to cure properly. But, you don't need to keep wetting it if you keep it covered.
Joe Watson " A year from now, you will wish that you had started today" My Build Album / My Build
Comment
-
Originally posted by Gulf View PostBetween layers I used an acrylic fortifier bonding agent. It was also used to replace a lot of the water in each layer.
Originally posted by Gulf View PostI think that you are hanging stucco over chicken wire.
Yes, the only wire I used was chicken wire. I do have some hardware cloth I could use... Do you think I should wrap this coat in the hardware cloth and do one more brown coat over that before the finish coat for added strength? I might run low on real estate in a couple places, but I think I can make up for that by cutting the brick veneers a little thinner in those few spots if I have to..
Comment
-
....Do you think I should wrap this coat in the hardware cloth.......?Joe Watson " A year from now, you will wish that you had started today" My Build Album / My Build
Comment
-
Originally posted by Gulf View PostNo, the premix should have fibers in it that add a lot of strength. But, do complete all 3 coats.
Comment
-
Originally posted by Gulf View PostNo, the premix should have fibers in it that add a lot of strength. But, do complete all 3 coats.
Maybe I should use this as my finish coat instead for the fibers and extra waterproofing?
Comment
-
Originally posted by Gulf View PostThe fibers a not very big. If you have an old window screen, sieve a hand full through it.
https://www.quikrete.com/productline...reinforced.asp vs https://www.quikrete.com/productline...wnbasecoat.asp
I think I better go with the Quikwall for my finish layer to be safe.
Comment
-
To save time, instead of doing the recommended 3 coats, I only do one coat of around 15 mm thickness with the added AR fibres, and sponge finish this layer. Cover for a week to hold the moisture in this layer. Then, after several firings (if moisture is still present it can cause blistering) I then use a thinned 100% acrylic render which can be painted on. This smooths out any tooling marks and creates a waterproof finish.
There are lots of different approaches so don’t have to follow my method.Kindled with zeal and fired with passion.
Comment
Comment