Announcement

Collapse
No announcement yet.

new build in werribee

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • UtahBeehiver
    replied
    Colin,
    Great to see you have broken ground. Looking forward to seeing number 2 oven!

    Leave a comment:


  • oasiscdm
    replied
    Thought i would give you all a few pictures of next Oven site.

    As you can see needs a bit of work, but there was a huge yucca there.

    The base will be bigger than my first oven am thinking 2m x 2m. Oven same sized around the 40" mark.
    I love the Japanese themed Garden so will be doing similar to the last oven,
    but making the changes to this build based on hindsight.

    Not sure when i will start as i need to complete a Deck first, as this will give me my levels for the base of oven, as i want it same height as the step off the deck.

    Am a little ocncerned about snakes getting into wood storage under the oven though. Scary thought.

    Leave a comment:


  • oasiscdm
    replied
    Ok Guys I have fixed all the links if any are still broken let me know.

    I have noted all the other links past page 36 and will update these over next week.

    Cheers and i hope this makes the thread easier to traverse.

    I will put all photos into a picasa album when i get a chance. This will include the build of the the out door area. Not loading that up here. My main focus is that this thread focus on the oven Build.

    Next oven will begin this year, but need other things completed first eg Deck

    Leave a comment:


  • oasiscdm
    replied
    thanks guys i will have a look at that first link and follow what you said Gulf. At least there are only 72 pages now not 100 odd LOL

    Gulf I went to the first link worked out what i need to do and set it up. Works a treat. Check it out.

    I will on the others over the next period week or two.
    Last edited by oasiscdm; 01-16-2017, 09:29 PM.

    Leave a comment:


  • Gulf
    replied
    Hi Colin,

    I think that JR is right. But, I also think that Mitch was hand repairing each link as they were presented to him. When doing a copy and paste of your first link
    Base Slab Construction post 24 it points to http://www.fornobravo.com/forum/51/n...tml#post142449

    Going to page 2, post # 24 and clicking on the post number it brings up a box that now points to https://community.fornobravo.com/for...901#post199901

    I am afraid that those links will have to be repaired by hand. It is something you can do as an edit. I know that that is time consuming but, it is doable.





    Leave a comment:


  • JRPizza
    replied
    Colin, that problem may go all the way back to when they broke the site with the big update. I tried using your index during my build but ended up having to surf through your entire 72 pages.
    I started a thread a while back and when Mitch was here he was pretty good at either fixing right away or providing status.
    Nice work by the way
    The forum is slowly recovering from the "upgrade", so I wanted to start this thread to help the moderators find/fix damaged links. I think I know that links to the photo gallery won't be fixable, but if you find others please post them here and Mitch and Co can hopefully fix them.

    Leave a comment:


  • oasiscdm
    replied
    Hi Has been a while.

    I am curious i have some links to specific pages on page 1 of this thread that do not work anymore.


    Does anyone know how to fix these on this forum. Cannot work it out.

    Click link in footer of any page and you will see what i mean.




    Leave a comment:


  • oasiscdm
    replied
    Originally posted by cobblerdave View Post
    G'day Colin
    Great to hear from you awaiting your next oven... But it's important to unpack a few boxes and put up a few pictures before starting the next oven.
    regards Dave
    Nice hearing from you Dave....
    Yes very much agree, getting carpet installed on Friday, Curtains hopefully a week later. Floors to stop squeaking, painting to do. WE are currently walking around furniture.

    Will post some photos of back yard tomorrow.

    Am hoping to get the base set out and poured new year.

    Leave a comment:


  • cobblerdave
    replied
    G'day Colin
    Great to hear from you awaiting your next oven... But it's important to unpack a few boxes and put up a few pictures before starting the next oven.
    regards Dave

    Leave a comment:


  • oasiscdm
    replied
    Originally posted by Gulf View Post
    Colin,

    Wow! The oven looks great. I remember the first days of your build when the discussion was about tying it in with a Japanese garden. You definitely nailed that. I'm already looking forward to your next oven build.
    thx Joe.

    Will be identical oven, in slightly larger different Japanese garden. I loved the garden so much I will be replicating it. On selling i removed lantern and bowl and grass trees so they will be incorporated into landscaping/

    The oven stand will be bigger 2m x 2m and hearth a little lower with base table same height as hearth being the only difference, The surface product i used to seal dome of oven i purchased enough to complete the new oven. Using 600x300x75mm tiled hearth, will be increasing calsil under floor to 75mm thickness will also increase thickness of ceramic blanket. I still wont be using a vermiculate layer and will stick with shiralite layer locking the dome.



    Last edited by oasiscdm; 11-25-2016, 04:19 PM.

    Leave a comment:


  • Gulf
    replied
    Colin,

    Wow! The oven looks great. I remember the first days of your build when the discussion was about tying it in with a Japanese garden. You definitely nailed that. I'm already looking forward to your next oven build.

    Leave a comment:


  • oasiscdm
    replied
    And just a couple of the front. I timed completion perfectly so that everything was in flower for open house weekend. Sold day after weekend open for inspection. Flowers all started dieing off the following week.

    Last edited by oasiscdm; 11-24-2016, 11:05 PM.

    Leave a comment:


  • oasiscdm
    replied
    HI All

    So the end of a new beginning. House settled today. so I thought I would post the photo's of the completed project finally.
    These are profeesional photo's and when i get time i will put an album together and post for the whole build.

    I will be starting a new build at the new home new year. Have a few things to do before starting to keep swmbo happy eg. Indoor stuff.

    Leave a comment:


  • daveskis
    replied
    Nice House Colin, I like the way you have constructed the outdoor kitchen area. I can see you have put some of your creativity in to the house as well. Well done mate. You deserve that good return.

    I have started my build over on Pompeii Construction under A Land Down Under 39". Slow progress with all this rain.
    Regards Dave

    Leave a comment:


  • oasiscdm
    replied
    Sorry Dave have been busy.

    update

    house sold settles Friday coming. Whole move took 3 months and got a great price. check this link for final photos and build completion.

    https://www.realestate.com.au/sold/in-10+cromwell+rd+werribee/list-1

    Am planning new oven as we speak and hoping to get base slab done by end January. I now get to implement changes and improvments. yay!!!! eg. Hearth, landing and external table all on the same level.

    be great to see your build.




    Leave a comment:

Working...
X