MY NEW 42"OVEN BUILD.

Collapse
X
 
  • Time
  • Show
Clear All
new posts
  • Larry P
    Apprentice
    • Aug 2014
    • 149

    #121
    BTW here's a video of oven insulation being installed at the Forno Bravo factory: https://www.youtube.com/watch?v=Lq4lpzK-uFQ

    Comment

    • ivancito
      Apprentice
      • May 2012
      • 155

      #122
      Thanks everyone for all the info on the ceramic blanket.
      Ivan

      Comment

      • ivancito
        Apprentice
        • May 2012
        • 155

        #123
        I thought this moment would never get here. All that's left is to cut the plug and my dome is closed. I was hoping for tighter joints but once I went to 3rd bricks the spreadsheet angles were way off. Regardless í am very proud of my work as this was my first brick job. Thanks everyone for getting me here.
        Ivan.

        Comment

        • RandyJ
          Il Pizzaiolo
          • May 2010
          • 1191

          #124
          Hey Ivan congrats. You are almost there. It is looking great.

          Randy

          Comment

          • Larry P
            Apprentice
            • Aug 2014
            • 149

            #125
            Congrats! So you plugged it today?

            Comment

            • ivancito
              Apprentice
              • May 2012
              • 155

              #126
              Originally posted by Larry P
              Congrats! So you plugged it today?
              Thanks guys for the encouragement. Larry I have not plugged it yet, I plan on getting it done in the next couple days. Next gotta start on the vent and outer arch which will be another challenge.
              Ivan.

              Comment

              • ivancito
                Apprentice
                • May 2012
                • 155

                #127
                My outer arch/vent landing almost done. Waiting on my chimney anchor plate to finalize vent opeing size. Having a flared entry is going to be beneficial but was a pain to build the outer arch. I also cut an 1" L-knotch on the bricks to rest on inner dome arch. Thanks everyone.
                Ivan

                Comment

                • ivancito
                  Apprentice
                  • May 2012
                  • 155

                  #128
                  Finally plugged the dome and entry arch is done, waiting on chimney anchor plate to build up the chimney. I had 2 heat lamps on overnight and barely reading 150°. Thanks everyone. Ivan

                  Comment

                  • ivancito
                    Apprentice
                    • May 2012
                    • 155

                    #129
                    Originally posted by ivancito
                    Finally plugged the dome and entry arch is done, waiting on chimney anchor plate to build up the chimney. I had 2 heat lamps on overnight and barely reading 150°. Thanks everyone. Ivan
                    I covered the entry with the arch template and sealed the entry with a towel and got temp up to 250, will leave the lights on for a couple more days.
                    Ivan

                    Comment

                    • Yeager
                      Laborer
                      • Jul 2015
                      • 95

                      #130
                      Good idea with the brackets supporting each wall with the archway - I was going to comment on that, but you addressed it! I am going to use 12" Concrete Block in to support each side.

                      Comment

                      • ivancito
                        Apprentice
                        • May 2012
                        • 155

                        #131
                        Thanks Yeager, your build looks great. I also plan on wrapping the the soldier course with 1/4 metal fabric at least to the full height of the soldiers and use homebrew to lock it in. I'm hoping this will act as a buttress to help support the soldier course. I will post some pics when i start the work.
                        Ivan

                        Comment

                        • ivancito
                          Apprentice
                          • May 2012
                          • 155

                          #132

                          Comment

                          • ivancito
                            Apprentice
                            • May 2012
                            • 155

                            #133
                            I had to add 4 corner supports for my supervent, the flange holes were too close to brick edge. I also beveled the inside face of each corner brick to help smoke transition into the supervent.

                            Comment

                            • joeykramer
                              Laborer
                              • Apr 2013
                              • 86

                              #134
                              looking real nice! what is the measurements of your vent opening? is that a duravent plate? im looking to source a plate myself, just curious.

                              Joe

                              Comment

                              • ivancito
                                Apprentice
                                • May 2012
                                • 155

                                #135
                                Joe
                                Thanks for your reply, my vent opening is 10"X10" I got the stainless steel supervent from Menards for $26. Also ordered a 36" length class A pipe.@joeykramer
                                Ivan
                                Vendor part #JSC8AP
                                Supervent 8" Adapter Plate

                                Comment

                                Working...