BTW here's a video of oven insulation being installed at the Forno Bravo factory: https://www.youtube.com/watch?v=Lq4lpzK-uFQ
X
-
I thought this moment would never get here. All that's left is to cut the plug and my dome is closed. I was hoping for tighter joints but once I went to 3rd bricks the spreadsheet angles were way off. Regardless í am very proud of my work as this was my first brick job. Thanks everyone for getting me here.
Ivan.
Comment
-
-
My outer arch/vent landing almost done. Waiting on my chimney anchor plate to finalize vent opeing size. Having a flared entry is going to be beneficial but was a pain to build the outer arch. I also cut an 1" L-knotch on the bricks to rest on inner dome arch. Thanks everyone.
Ivan
Comment
-
Originally posted by ivancito View PostFinally plugged the dome and entry arch is done, waiting on chimney anchor plate to build up the chimney. I had 2 heat lamps on overnight and barely reading 150°. Thanks everyone. Ivan
Ivan
Comment
-
Thanks Yeager, your build looks great. I also plan on wrapping the the soldier course with 1/4 metal fabric at least to the full height of the soldiers and use homebrew to lock it in. I'm hoping this will act as a buttress to help support the soldier course. I will post some pics when i start the work.
Ivan
Comment
Comment