Planning on putting a half dozen or so weep holes. I have the 1/2 inch pvc sitting there ready to go, just need to drill holes in the 2x6's so that they stay put when the concrete is poured around them.
Trying to figure out if raising the cement mixer high enough to pour straight onto the form would be better than pouring into buckets and lifting them up to pour into the form... I was thinking that I might be able to make a chute to pour it into certain areas if I raised up the mixer, but then I would have to climb a few rungs on a ladder to load the mixer.... might just be easier to lift the buckets
Trying to figure out if raising the cement mixer high enough to pour straight onto the form would be better than pouring into buckets and lifting them up to pour into the form... I was thinking that I might be able to make a chute to pour it into certain areas if I raised up the mixer, but then I would have to climb a few rungs on a ladder to load the mixer.... might just be easier to lift the buckets